Difference between revisions of "Run Meeting: Nov 13th, 2018"
(Created page with " '''Back to:''' : Main Page : Daily Run Meetings 3:30PM Run Meeting, Counting house meeting room (200C) '''RC:''' Jason Bane ==Summary...") |
|||
Line 9: | Line 9: | ||
==Summary of past 24h:== | ==Summary of past 24h:== | ||
+ | Major Problems: | ||
+ | -After system recovery during day shift yesterday, MCC started to bring the machine back online. During this process the South linac PSS system dropped. https://logbooks.jlab.org/entry/3625100 -Lost 2.5 hours | ||
+ | -Shortly after this, PSS dropped again - Lost 3.5 hours | ||
+ | -Then from 22:45 till 04:30, numerous down time events https://accweb.acc.jlab.org/dtm/all-events?incidentId=5431 | ||
+ | -Around 3:30 the truck ramp door opened https://logbooks.jlab.org/entry/3625300!!! Closed around 5 | ||
+ | - From 6:30 till now, 0R08 BLA Trips | ||
+ | |||
+ | The end of owl on Monday till the end of owl today, we have received about 12 Minutes of quality beam on target. | ||
+ | Then about 1 hour of beam through day shift today. | ||
+ | |||
+ | ==Current Plan== | ||
+ | Take data on Hydrogen at the 3H kinematics. | ||
+ | 11/14 day shift, change to 3H at these same kinematics. | ||
==Slides/Links== | ==Slides/Links== |
Revision as of 15:13, 13 November 2018
Back to:
3:30PM Run Meeting, Counting house meeting room (200C)
RC: Jason Bane
Summary of past 24h:
Major Problems: -After system recovery during day shift yesterday, MCC started to bring the machine back online. During this process the South linac PSS system dropped. https://logbooks.jlab.org/entry/3625100 -Lost 2.5 hours -Shortly after this, PSS dropped again - Lost 3.5 hours -Then from 22:45 till 04:30, numerous down time events https://accweb.acc.jlab.org/dtm/all-events?incidentId=5431 -Around 3:30 the truck ramp door opened https://logbooks.jlab.org/entry/3625300!!! Closed around 5 - From 6:30 till now, 0R08 BLA Trips
The end of owl on Monday till the end of owl today, we have received about 12 Minutes of quality beam on target. Then about 1 hour of beam through day shift today.
Current Plan
Take data on Hydrogen at the 3H kinematics. 11/14 day shift, change to 3H at these same kinematics.
Slides/Links
MCC scheduling Whiteboard: http://accboard.acc.jlab.org/
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/
Tritium wiki page: https://wiki.jlab.org/tegwiki/index.php/Main_Page
Bluejeans connection information
To join the Meeting: https://bluejeans.com/256205934
To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934
To join via phone : 1) Dial:
+1.408.740.7256 (United States) +1.888.240.2560 (US Toll Free) +1.408.317.9253 (Alternate number) (see all numbers - http://bluejeans.com/numbers)
2) Enter Conference ID : 256205934