Difference between revisions of "Installation and Commissioning"
Jump to navigation
Jump to search
Line 5: | Line 5: | ||
==Commissioning Schedule== | ==Commissioning Schedule== | ||
− | + | === BPM calibration runs (Bull's eye scan) === | |
<table border="1" style="width:80%"> | <table border="1" style="width:80%"> | ||
<tr> | <tr> | ||
Line 57: | Line 57: | ||
</table> | </table> | ||
− | + | === BCM calibration runs === | |
<table border="1" style="width:80%"> | <table border="1" style="width:80%"> | ||
<tr> | <tr> | ||
Line 79: | Line 79: | ||
</table> | </table> | ||
− | + | === Optics commissioning runs === | |
* LHRS optics runs | * LHRS optics runs | ||
* <b>Step L1: Procedure with Sieve-slit</b> | * <b>Step L1: Procedure with Sieve-slit</b> | ||
Line 255: | Line 255: | ||
</table> | </table> | ||
− | + | === Optics commissioning runs === | |
* RHRS optics runs | * RHRS optics runs | ||
* <b>Step R1: Procedure with Sieve-slit</b> | * <b>Step R1: Procedure with Sieve-slit</b> | ||
Line 430: | Line 430: | ||
</tr> | </tr> | ||
</table> | </table> | ||
+ | |||
+ | |||
+ | === Target Boiling Study === | ||
+ | |||
+ | |||
+ | * <b>H3 Target</b> | ||
+ | <table border="1" style="width:80%"> | ||
+ | <tr> | ||
+ | <td>Run number</td> | ||
+ | <td>Target</td> | ||
+ | <td>Beam Current</td> | ||
+ | <td>Raster Size </td> | ||
+ | <td>E<SUB>beam</SUB> [GeV]</td> | ||
+ | <td>P<SUB>0</SUB> [GeV/c]</td> | ||
+ | <td>θ<SUB>e</SUB> [deg]</td> | ||
+ | <td>Comment</td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td> </td> | ||
+ | <td>H3</td> | ||
+ | <td>25uA</td> | ||
+ | <td>2x2 cm</td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td> </td> | ||
+ | <td>H3</td> | ||
+ | <td>15uA</td> | ||
+ | <td>2x2 cm</td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td> </td> | ||
+ | <td>H3</td> | ||
+ | <td>5uA</td> | ||
+ | <td>2x2 cm</td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | </tr> | ||
+ | |||
+ | * <b>He3 Target</b> | ||
+ | <table border="1" style="width:80%"> | ||
+ | <tr> | ||
+ | <td>Run number</td> | ||
+ | <td>Target</td> | ||
+ | <td>Beam Current</td> | ||
+ | <td>Raster Size </td> | ||
+ | <td>E<SUB>beam</SUB> [GeV]</td> | ||
+ | <td>P<SUB>0</SUB> [GeV/c]</td> | ||
+ | <td>θ<SUB>e</SUB> [deg]</td> | ||
+ | <td>Comment</td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td> </td> | ||
+ | <td>He3</td> | ||
+ | <td>25uA</td> | ||
+ | <td>2x2 cm</td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td> </td> | ||
+ | <td>He3</td> | ||
+ | <td>15uA</td> | ||
+ | <td>2x2 cm</td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td> </td> | ||
+ | <td>He3</td> | ||
+ | <td>5uA</td> | ||
+ | <td>2x2 cm</td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | </tr> | ||
+ | |||
+ | * <b>Carbon-Foil Target</b> | ||
+ | <table border="1" style="width:80%"> | ||
+ | <tr> | ||
+ | <td>Run number</td> | ||
+ | <td>Target</td> | ||
+ | <td>Beam Current</td> | ||
+ | <td>Raster Size </td> | ||
+ | <td>E<SUB>beam</SUB> [GeV]</td> | ||
+ | <td>P<SUB>0</SUB> [GeV/c]</td> | ||
+ | <td>θ<SUB>e</SUB> [deg]</td> | ||
+ | <td>Comment</td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td> </td> | ||
+ | <td>Carbon-Foil</td> | ||
+ | <td>25uA</td> | ||
+ | <td>2x2 cm</td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td> </td> | ||
+ | <td>Carbon-Foil</td> | ||
+ | <td>15uA</td> | ||
+ | <td>2x2 cm</td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td> </td> | ||
+ | <td>Carbon-Foil</td> | ||
+ | <td>5uA</td> | ||
+ | <td>2x2 cm</td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | </tr> |
Revision as of 16:21, 15 November 2016
Installation Plan and Commissioning Plan Page (Back to Tritium-Main)
Installation Schedule
Commissioning Schedule
BPM calibration runs (Bull's eye scan)
Relative position | LHRS CODA run | RHRS CODA run | Harp scan entry no. |
(0,0) | |||
(2,2) | |||
(2,-2) | |||
(-2,-2) | |||
(-2,2) | |||
(3,3) | |||
(-3,-3) |
BCM calibration runs
LHRS CODA run | RHRS CODA run | BCM logger | Comments |
Optics commissioning runs
- LHRS optics runs
- Step L1: Procedure with Sieve-slit
Run number | Target | Sieve | Raster | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
Multi-foil carbon | Yes | Off | |||||
15cm LH2 | Yes | 2 x 2 mm2 | |||||
Multi-foil carbon | Yes | Off |
- Step L2: Delta Scan with Proton Elastic (with sieve slit)
Run number | Target | Sieve | Raster | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
15cm LH2 | Yes | 2 x 2 mm2 | Delta scan ΔP=-4%; | ||||
15cm LH2 | Yes | 2 x 2 mm2 | Delta scan ΔP=-2%; | ||||
15cm LH2 | Yes | 2 x 2 mm2 | Delta scan ΔP=0%; | ||||
15cm LH2 | Yes | 2 x 2 mm2 | Delta scan ΔP=+2%; | ||||
15cm LH2 | Yes | 2 x 2 mm2 | Delta scan ΔP=+4%; |
- Step L3: Dummy Target Runs (with sieve slit)
Run number | Target | Sieve | Raster | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
15cm dummy | Yes | 2 x 2 mm2 | +4% delta scan setting |
- Step L4: Proton Elastic Kinematics
Run number | Target | Sieve | Raster | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
Single-foil carbon | No | Off | |||||
15cm dummy | No | 2 x 2 mm2 | |||||
15cm LH2 | No | 2 x 2 mm2 |
Optics commissioning runs
- RHRS optics runs
- Step R1: Procedure with Sieve-slit
Run number | Target | Sieve | Raster | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
Multi-foil carbon | Yes | Off | |||||
15cm LH2 | Yes | 2 x 2 mm2 | |||||
Multi-foil carbon | Yes | Off |
- Step R2: Delta Scan with Proton Elastic (with sieve slit)
Run number | Target | Sieve | Raster | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
15cm LH2 | Yes | 2 x 2 mm2 | Delta scan ΔP=-4%; | ||||
15cm LH2 | Yes | 2 x 2 mm2 | Delta scan ΔP=-2%; | ||||
15cm LH2 | Yes | 2 x 2 mm2 | Delta scan ΔP=0%; | ||||
15cm LH2 | Yes | 2 x 2 mm2 | Delta scan ΔP=+2%; | ||||
15cm LH2 | Yes | 2 x 2 mm2 | Delta scan ΔP=+4%; |
- Step R3: Dummy Target Runs (with sieve slit)
Run number | Target | Sieve | Raster | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
15cm dummy | Yes | 2 x 2 mm2 | +4% delta scan setting |
- Step R4: Proton Elastic Kinematics
Run number | Target | Sieve | Raster | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
Single-foil carbon | No | Off | |||||
15cm dummy | No | 2 x 2 mm2 | |||||
15cm LH2 | No | 2 x 2 mm2 |
Target Boiling Study
- H3 Target
- He3 Target
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
H3 | 25uA | 2x2 cm | |||||
H3 | 15uA | 2x2 cm | |||||
H3 | 5uA | 2x2 cm |
- Carbon-Foil Target
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
He3 | 25uA | 2x2 cm | |||||
He3 | 15uA | 2x2 cm | |||||
He3 | 5uA | 2x2 cm |
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
Carbon-Foil | 25uA | 2x2 cm | |||||
Carbon-Foil | 15uA | 2x2 cm | |||||
Carbon-Foil | 5uA | 2x2 cm |