Revision as of 16:42, 15 November 2016
Installation Plan and Commissioning Plan Page (Back to Tritium-Main)
Installation Schedule
Survey Info
Beam Instrumentation
Target Positions
Spectrometer Angles
Commissioning Schedule
BPM calibration runs (Bull's eye scan)
Relative position | LHRS CODA run | RHRS CODA run | Harp scan entry no. |
(0,0) | |||
(2,2) | |||
(2,-2) | |||
(-2,-2) | |||
(-2,2) | |||
(3,3) | |||
(-3,-3) |
BCM calibration runs
LHRS CODA run | RHRS CODA run | BCM logger | Comments |
Optics commissioning runs
- LHRS optics runs
- Step L1: Procedure with Sieve-slit
Run number | Target | Sieve | Raster | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
Multi-foil carbon | Yes | Off | |||||
15cm LH2 | Yes | 2 x 2 mm2 | |||||
Multi-foil carbon | Yes | Off |
- Step L2: Delta Scan with Proton Elastic (with sieve slit)
Run number | Target | Sieve | Raster | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
15cm LH2 | Yes | 2 x 2 mm2 | Delta scan ΔP=-4%; | ||||
15cm LH2 | Yes | 2 x 2 mm2 | Delta scan ΔP=-2%; | ||||
15cm LH2 | Yes | 2 x 2 mm2 | Delta scan ΔP=0%; | ||||
15cm LH2 | Yes | 2 x 2 mm2 | Delta scan ΔP=+2%; | ||||
15cm LH2 | Yes | 2 x 2 mm2 | Delta scan ΔP=+4%; |
- Step L3: Dummy Target Runs (with sieve slit)
Run number | Target | Sieve | Raster | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
15cm dummy | Yes | 2 x 2 mm2 | +4% delta scan setting |
- Step L4: Proton Elastic Kinematics
Run number | Target | Sieve | Raster | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
Single-foil carbon | No | Off | |||||
15cm dummy | No | 2 x 2 mm2 | |||||
15cm LH2 | No | 2 x 2 mm2 |
- RHRS optics runs
- Step R1: Procedure with Sieve-slit
Run number | Target | Sieve | Raster | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
Multi-foil carbon | Yes | Off | |||||
15cm LH2 | Yes | 2 x 2 mm2 | |||||
Multi-foil carbon | Yes | Off |
- Step R2: Delta Scan with Proton Elastic (with sieve slit)
Run number | Target | Sieve | Raster | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
15cm LH2 | Yes | 2 x 2 mm2 | Delta scan ΔP=-4%; | ||||
15cm LH2 | Yes | 2 x 2 mm2 | Delta scan ΔP=-2%; | ||||
15cm LH2 | Yes | 2 x 2 mm2 | Delta scan ΔP=0%; | ||||
15cm LH2 | Yes | 2 x 2 mm2 | Delta scan ΔP=+2%; | ||||
15cm LH2 | Yes | 2 x 2 mm2 | Delta scan ΔP=+4%; |
- Step R3: Dummy Target Runs (with sieve slit)
Run number | Target | Sieve | Raster | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
15cm dummy | Yes | 2 x 2 mm2 | +4% delta scan setting |
- Step R4: Proton Elastic Kinematics
Run number | Target | Sieve | Raster | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
Single-foil carbon | No | Off | |||||
15cm dummy | No | 2 x 2 mm2 | |||||
15cm LH2 | No | 2 x 2 mm2 |
Target Boiling Study
- H3 and He3 Target. Use C12 target as a normalization check for beam-current dependent rate check.
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
H3 | 25uA | 2x2 cm | |||||
H3 | 15uA | 2x2 cm | |||||
H3 | 5uA | 2x2 cm |
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
Carbon-Foil | 25uA | 2x2 cm | |||||
Carbon-Foil | 15uA | 2x2 cm | |||||
Carbon-Foil | 5uA | 2x2 cm |