Difference between revisions of "Installation and Commissioning"
Jump to navigation
Jump to search
m |
|||
Line 202: | Line 202: | ||
<td>He3</td> | <td>He3</td> | ||
<td>15uA</td> | <td>15uA</td> | ||
− | <td>2x2 | + | <td>2x2 mm</td> |
<td> </td> | <td> </td> | ||
<td> </td> | <td> </td> | ||
Line 237: | Line 237: | ||
<td>Carbon-Foil</td> | <td>Carbon-Foil</td> | ||
<td>25uA</td> | <td>25uA</td> | ||
− | <td>2x2 | + | <td>2x2 mm</td> |
<td> </td> | <td> </td> | ||
<td> </td> | <td> </td> | ||
Line 247: | Line 247: | ||
<td>Carbon-Foil</td> | <td>Carbon-Foil</td> | ||
<td>15uA</td> | <td>15uA</td> | ||
− | <td>2x2 | + | <td>2x2 mm</td> |
<td> </td> | <td> </td> | ||
<td> </td> | <td> </td> | ||
Line 257: | Line 257: | ||
<td>Carbon-Foil</td> | <td>Carbon-Foil</td> | ||
<td>5uA</td> | <td>5uA</td> | ||
− | <td>2x2 | + | <td>2x2 mm</td> |
<td> </td> | <td> </td> | ||
<td> </td> | <td> </td> |
Revision as of 17:27, 15 November 2016
Installation Schedule
Target Installation
Other Installation (e.g.,parasitic test)
Survey Info
Beam Instrumentation
Target Positions
Spectrometer Angles
- HRS-L
Angle | Time | Experiment | Run Number Ranges | Report | Comment |
20 | 02/01/2017 | MARATHON | 1111 ~ 2222 | link |
- HRS-L
Angle | Time | Experiment | Run Number Ranges | Report | Comment |
20 | 02/01/2017 | MARATHON | 1111 ~ 2222 | link |
Commissioning Schedule
Optics commissioning runs
BPM calibration runs (Bull's eye scan)
Relative position | LHRS CODA run | RHRS CODA run | Harp scan entry no. |
(0,0) | |||
(2,2) | |||
(2,-2) | |||
(-2,-2) | |||
(-2,2) | |||
(3,3) | |||
(-3,-3) |
BCM calibration runs
LHRS CODA run | RHRS CODA run | BCM logger | Comments |
Target Boiling Study
- H3 Target
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
H3 | 25uA | 2x2 cm | |||||
H3 | 15uA | 2x2 cm | |||||
H3 | 5uA | 2x2 cm |
- He3 Target
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
He3 | 25uA | 2x2 cm | |||||
He3 | 15uA | 2x2 mm | |||||
He3 | 5uA | 2x2 cm |
- C12 target for a normalization check for beam-current dependent rate check.
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
Carbon-Foil | 25uA | 2x2 mm | |||||
Carbon-Foil | 15uA | 2x2 mm | |||||
Carbon-Foil | 5uA | 2x2 mm |
Dedicated Commissioning Plans
MARATHON
Elastic
(ee') SRC (x>1)
(ee'p) SRC
Beam Energy Measurements
Energy of central ray (MeV) | Dispersive mode | Halog entry |
11000.00 | ||
4400 | ||
2200 |