Difference between revisions of "Installation and Commissioning"

From Tritium Experiments Group
Jump to navigation Jump to search
m
Line 202: Line 202:
 
     <td>He3</td>
 
     <td>He3</td>
 
     <td>15uA</td>
 
     <td>15uA</td>
     <td>2x2 cm</td>
+
     <td>2x2 mm</td>
 
     <td> </td>
 
     <td> </td>
 
     <td> </td>
 
     <td> </td>
Line 237: Line 237:
 
     <td>Carbon-Foil</td>
 
     <td>Carbon-Foil</td>
 
     <td>25uA</td>
 
     <td>25uA</td>
     <td>2x2 cm</td>
+
     <td>2x2 mm</td>
 
     <td> </td>
 
     <td> </td>
 
     <td> </td>
 
     <td> </td>
Line 247: Line 247:
 
     <td>Carbon-Foil</td>
 
     <td>Carbon-Foil</td>
 
     <td>15uA</td>
 
     <td>15uA</td>
     <td>2x2 cm</td>
+
     <td>2x2 mm</td>
 
     <td> </td>
 
     <td> </td>
 
     <td> </td>
 
     <td> </td>
Line 257: Line 257:
 
     <td>Carbon-Foil</td>
 
     <td>Carbon-Foil</td>
 
     <td>5uA</td>
 
     <td>5uA</td>
     <td>2x2 cm</td>
+
     <td>2x2 mm</td>
 
     <td> </td>
 
     <td> </td>
 
     <td> </td>
 
     <td> </td>

Revision as of 18:27, 15 November 2016

Back to Tritium-Main

Installation Schedule

Target Installation

Other Installation (e.g.,parasitic test)

Survey Info

Beam Instrumentation

Target Positions

Spectrometer Angles

  • HRS-L
Angle Time Experiment Run Number Ranges Report Comment
20 02/01/2017 MARATHON 1111 ~ 2222 link
  • HRS-L
Angle Time Experiment Run Number Ranges Report Comment
20 02/01/2017 MARATHON 1111 ~ 2222 link

Commissioning Schedule

Optics commissioning runs

BPM calibration runs (Bull's eye scan)

Relative position LHRS CODA run RHRS CODA run Harp scan entry no.
(0,0)
(2,2)
(2,-2)
(-2,-2)
(-2,2)
(3,3)
(-3,-3)

BCM calibration runs

LHRS CODA run RHRS CODA run BCM logger Comments

Target Boiling Study

  • H3 Target
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
H3 25uA 2x2 cm
H3 15uA 2x2 cm
H3 5uA 2x2 cm
  • He3 Target
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
He3 25uA 2x2 cm
He3 15uA 2x2 mm
He3 5uA 2x2 cm


  • C12 target for a normalization check for beam-current dependent rate check.
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
Carbon-Foil 25uA 2x2 mm
Carbon-Foil 15uA 2x2 mm
Carbon-Foil 5uA 2x2 mm

Dedicated Commissioning Plans

MARATHON

Elastic

(ee') SRC (x>1)

(ee'p) SRC

Beam Energy Measurements

Energy of central ray (MeV) Dispersive mode Halog entry
11000.00
4400
2200