Difference between revisions of "File:RHRS DAQmaps april17.pptx"
Jump to navigation
Jump to search
(Overview over cable connections in the right electronic rack on the RHRS after the Argon beam time in spring 2017 and before the tritium setup. The connections include TS, TM, Retiming cables as well as all NIM modules. The setup will be cleaned for tr...) |
|||
Line 1: | Line 1: | ||
− | Overview over cable connections in the right electronic rack on the RHRS after the Argon beam time in spring 2017 and before the tritium setup. The connections include TS, TM, Retiming cables as well as all NIM modules. The setup will be cleaned for tritium run in fall17/spring18 | + | Overview over cable connections in the right electronic rack on the RHRS after the Argon beam time in spring 2017 and before the tritium setup. The connections include TS, TM, Retiming cables as well as all NIM modules. The setup will be cleaned for tritium run in fall17/spring18. Plots done by Rey Cruz Torres |
Latest revision as of 15:45, 1 July 2017
Overview over cable connections in the right electronic rack on the RHRS after the Argon beam time in spring 2017 and before the tritium setup. The connections include TS, TM, Retiming cables as well as all NIM modules. The setup will be cleaned for tritium run in fall17/spring18. Plots done by Rey Cruz Torres
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Dimensions | User | Comment | |
---|---|---|---|---|
current | 15:44, 1 July 2017 | (126 KB) | Hauenst (talk | contribs) | Overview over cable connections in the right electronic rack on the RHRS after the Argon beam time in spring 2017 and before the tritium setup. The connections include TS, TM, Retiming cables as well as all NIM modules. The setup will be cleaned for tr... |
You cannot overwrite this file.
File usage
There are no pages that use this file.