Difference between revisions of "Installation and Commissioning"
Jump to navigation
Jump to search
m |
m |
||
Line 56: | Line 56: | ||
</table> | </table> | ||
− | =Commissioning | + | =Commissioning Plan= |
+ | ==Before Beam== | ||
+ | ==First Beam== | ||
+ | |||
+ | =Commissioning Results= | ||
== [https://wiki.jlab.org/tegwiki/index.php/Optics_Calibration Optics commissioning runs] == | == [https://wiki.jlab.org/tegwiki/index.php/Optics_Calibration Optics commissioning runs] == | ||
== BPM calibration runs (Bull's eye scan) == | == BPM calibration runs (Bull's eye scan) == |
Revision as of 12:46, 21 September 2017
Back to 2017 Fall Run Plan Back to Tritium-Main
Installation Schedule
Target Installation
Other Installation (e.g.,parasitic test)
Survey Info
Beam Instrumentation
Target Positions
Spectrometer Angles
- HRS-L
Angle | Time | Experiment | Run Number Ranges | Report | Comment |
20 | 02/01/2017 | MARATHON | 1111 ~ 2222 | link |
- HRS-L
Angle | Time | Experiment | Run Number Ranges | Report | Comment |
20 | 02/01/2017 | MARATHON | 1111 ~ 2222 | link |
Commissioning Plan
Before Beam
First Beam
Commissioning Results
Optics commissioning runs
BPM calibration runs (Bull's eye scan)
Relative position | LHRS CODA run | RHRS CODA run | Harp scan entry no. |
(0,0) | |||
(2,2) | |||
(2,-2) | |||
(-2,-2) | |||
(-2,2) | |||
(3,3) | |||
(-3,-3) |
BCM calibration runs
Beam Current (uA) | LHRS CODA run | RHRS CODA run | BCM logger | Comments |
5 | ||||
10 | ||||
15 | ||||
20 | ||||
25 |
Target Boiling Study
- H3 Target
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
H3 | 25uA | 2x2 cm | |||||
H3 | 15uA | 2x2 cm | |||||
H3 | 5uA | 2x2 cm |
- He3 Target
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
He3 | 25uA | 2x2 cm | |||||
He3 | 15uA | 2x2 mm | |||||
He3 | 5uA | 2x2 cm |
- C12 target for a normalization check for beam-current dependent rate check.
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
Carbon-Foil | 25uA | 2x2 mm | |||||
Carbon-Foil | 15uA | 2x2 mm | |||||
Carbon-Foil | 5uA | 2x2 mm |
Beam Energy Measurements
Energy of central ray (MeV) | Dispersive mode | Halog entry |
11000.00 | ||
4400 | ||
2200 |