Difference between revisions of "Installation and Commissioning"
Jump to navigation
Jump to search
m (→Before Beam) |
|||
Line 71: | Line 71: | ||
==With Beam== | ==With Beam== | ||
+ | |||
+ | <ol> | ||
+ | |||
+ | <li> Beamline | ||
+ | <ol> | ||
+ | <li> Raster Size Calibration | ||
+ | <li> Beam Centering | ||
+ | <li> BPM Calibration (Bullseye scan) | ||
+ | <li> BCM Calibration | ||
+ | <li> ARC Energy Measurement | ||
+ | </ol> | ||
+ | |||
+ | <li> Trigger Timing Checkout | ||
+ | |||
+ | <li> Detector Checkout | ||
+ | <ol> | ||
+ | <li> VDC wiremaps and efficiencies | ||
+ | <li> TDC distributions of hodoscopes and GC | ||
+ | <li> fastbus ADC distributions of hodoscopes, GC, and calorimeters | ||
+ | <li> FlashADC distributions of hodoscopes and GC | ||
+ | <li> Check all scalers | ||
+ | <li> check thresholds | ||
+ | </ol> | ||
+ | |||
+ | <li> HRS Optics | ||
+ | |||
+ | <li> Detector Calibrations | ||
+ | |||
+ | <li> Target | ||
+ | |||
+ | </ol> | ||
=Commissioning Results= | =Commissioning Results= |
Revision as of 15:42, 21 September 2017
Back to 2017 Fall Run Plan Back to Tritium-Main
Installation Schedule
Target Installation
Other Installation (e.g.,parasitic test)
Survey Info
Beam Instrumentation
Target Positions
Spectrometer Angles
- HRS-L
Angle | Time | Experiment | Run Number Ranges | Report | Comment |
20 | 02/01/2017 | MARATHON | 1111 ~ 2222 | link |
- HRS-L
Angle | Time | Experiment | Run Number Ranges | Report | Comment |
20 | 02/01/2017 | MARATHON | 1111 ~ 2222 | link |
Commissioning Plan
Before Beam
- Trigger Timing Checkout (placeholder slides)
- HRS Detector Checkout
- VDC Wiremaps (placeholder slides)
- TDC distributions of hodoscopes and GC (placeholder slides)
- FastBus ADC distributions of hodoscopes, GC, and calorimeters (placeholder slides)
- FlashADC distributions of hodoscopes, GC, and calorimeters (placeholder slides)
- Beamline
- Twiddle Measurement to check BPMS (placeholder slides)
- Clock run with raster on, check and compare fastbus and Flash raster signals (placeholder slides)
With Beam
- Beamline
- Raster Size Calibration
- Beam Centering
- BPM Calibration (Bullseye scan)
- BCM Calibration
- ARC Energy Measurement
- Trigger Timing Checkout
- Detector Checkout
- VDC wiremaps and efficiencies
- TDC distributions of hodoscopes and GC
- fastbus ADC distributions of hodoscopes, GC, and calorimeters
- FlashADC distributions of hodoscopes and GC
- Check all scalers
- check thresholds
- HRS Optics
- Detector Calibrations
- Target
Commissioning Results
Optics commissioning runs
BPM calibration runs (Bull's eye scan)
Relative position | LHRS CODA run | RHRS CODA run | Harp scan entry no. |
(0,0) | |||
(2,2) | |||
(2,-2) | |||
(-2,-2) | |||
(-2,2) | |||
(3,3) | |||
(-3,-3) |
BCM calibration runs
Beam Current (uA) | LHRS CODA run | RHRS CODA run | BCM logger | Comments |
5 | ||||
10 | ||||
15 | ||||
20 | ||||
25 |
Target Boiling Study
- H3 Target
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
H3 | 25uA | 2x2 cm | |||||
H3 | 15uA | 2x2 cm | |||||
H3 | 5uA | 2x2 cm |
- He3 Target
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
He3 | 25uA | 2x2 cm | |||||
He3 | 15uA | 2x2 mm | |||||
He3 | 5uA | 2x2 cm |
- C12 target for a normalization check for beam-current dependent rate check.
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
Carbon-Foil | 25uA | 2x2 mm | |||||
Carbon-Foil | 15uA | 2x2 mm | |||||
Carbon-Foil | 5uA | 2x2 mm |
Beam Energy Measurements
Energy of central ray (MeV) | Dispersive mode | Halog entry |
11000.00 | ||
4400 | ||
2200 |