Run Meeting: February 26th, 2018

From Tritium Experiments Group
Revision as of 22:04, 26 February 2018 by Sanghwa (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Back to Main Page Daily_Run_Meetings

4:00PM Run Meeting, Counting house meeting room (200C)

Summary of past 24h:

- Very productive weekend. Running smoothly at 22uA.

- kin15: 20k, 19.4k, 19.1k for He3, H3 and D2 respectively.

- kin16: 12k events collected for He3

- Beam studies starting 9AM this morning. Parasitic data taking with empty cell while MCC was working on testing FFB system.

- Controlled access while MCC is working on optics. Walk-through and detector checklist performed. Jack and others on magnets.

- RHRS Q1 and Dipole failed around 3pm. Dipole LHe level went to zero. Soon after lost left arm dipole too. Experts are in contact.


Plan: Wait for the Dipole recovery and back to production as soon as we can. Will likely run LHRS alone first which normally recovers quickly.

Slides

BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653