Run Meeting: March 5th, 2018
Jump to navigation
Jump to search
Back to:
4:00PM Run Meeting, Counting house meeting room (200C)
RC: Carlos Ayerbe
Summary of past 72h:
Accelerator
- 7:30 - ARC magnet issues causes the beam to be off. Same problem was reported last Wednesday. ---> https://cebaf.jlab.org/dtm/open-events?event_id=3456
Friday March 2nd
Swing shift
- data production
Owl shift
- data production
- Due to a misunderstanding in the crew, two runs with H2 were taken.
Day shift
- data production
- 09:27 Beam to the Hall off due to Beamstopper A-chain dropped ---> https://logbooks.jlab.org/entry/3541990
Saturday March 3rd
Swing shift
- data production
Owl shift
- data production
Day shift
- data production
Sunday March 4th
Swing shift
- data production
Owl shift
- data production
Day shift
- data production
DATA Status
Round IX. Column 25/(24+4).
Plan:
-Changing LHRS polarity -measuring positrons (LHRS) -Normal running RHRS
Total: two shifts.
EXTRA:
- Monday Beam Studies
- Start 9:00 am
- opportunistic beam.
- FFB (2h)
- Beam OFF
- 'eta' tool devel (2h)
- Optics (3h)
- Beam back 16:00-17:00.
- Tuesday RF Recovery
- Start 8:30
- Ends 12:30
Slides
- Pass 1 Overview (Evan)
- Beam quality cut (Bane)
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/372278653