Run Meeting: April 20th, 2018
Jump to navigation
Jump to search
Back to:
4:00PM Run Meeting, Counting house meeting room (200C)
RC: Eric Fuchey
e'p
Smooth data taking during the last 24h. There were only minor beam issues i.e a change in the 2nd pass separator phase.
Collected statistics: 2.3 C < charge < 2.4 C on each target at run 100255.
Down times: injector problem (Gun HV Air Pressure Fault - bad solenoid): ~1h30 total; 2pass separator phase drift (~30 minutes)
Slides