Fall-2018 BPM Calibration

From Tritium Experiments Group
Revision as of 00:32, 27 September 2018 by Ssanties (talk | contribs) (Created page with "== BPM Calibrations (Bullseye Scan) [1-2 hours]== This calibration was done in the owl shift of 12/14.2017 using both arms DAQ, however the Right arm dipole wasn't enabled. S...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

BPM Calibrations (Bullseye Scan) [1-2 hours]

This calibration was done in the owl shift of 12/14.2017 using both arms DAQ, however the Right arm dipole wasn't enabled. Set Beam energy (MeV) : 6418.49 Current ~6.7 uA

Bulls eye scan for 12/14/2017

Relative position LHRS CODA run RHRS CODA run Harp scan entry no. HarpA time stamp HarpB time stamp
(1.4,1.8) 3434 93476 3504092 12142017_01:55:06 12142017_01:58:24
(2.4,2.8) 3435 93477 3504121 12142017_02:38:06 12142017_02:39:57
(0.4,2.8) 807 90597 3504130 12142017_02:49:00 12142017_02:52:45
(0.4,0.8) 808 90598 3504140 12142017_02:57:48 12142017_02:59:33
(2.4,0.8) 809 90599 3504146 12142017_03:04:43 12142017_03:08:13
(1.4,1.8) 810 90600 3504151 12142017_03:17:15 12142017_03:19:01