Installation Plan and Commissioning Plan Page (Back to Tritium-Main)
Installation Schedule
Commissioning Schedule
BPM calibration runs (Bull's eye scan)
Relative position |
LHRS CODA run |
RHRS CODA run |
Harp scan entry no. |
(0,0) |
|
|
|
(2,2) |
|
|
|
(2,-2) |
|
|
|
(-2,-2) |
|
|
|
(-2,2) |
|
|
|
(3,3) |
|
|
|
(-3,-3) |
|
|
|
BCM calibration runs
LHRS CODA run |
RHRS CODA run |
BCM logger |
Comments |
|
|
|
|
|
|
|
|
Optics commissioning runs
- LHRS optics runs
- Step L1: Procedure with Sieve-slit
Run number |
Target |
Sieve |
Raster |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Comment |
|
Multi-foil carbon |
Yes |
Off |
|
|
|
|
|
15cm LH2 |
Yes |
2 x 2 mm2 |
|
|
|
|
|
Multi-foil carbon |
Yes |
Off |
|
|
|
|
- Step L2: Delta Scan with Proton Elastic (with sieve slit)
Run number |
Target |
Sieve |
Raster |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Comment |
|
15cm LH2 |
Yes |
2 x 2 mm2 |
|
|
|
Delta scan ΔP=-4%; |
|
15cm LH2 |
Yes |
2 x 2 mm2 |
|
|
|
Delta scan ΔP=-2%; |
|
15cm LH2 |
Yes |
2 x 2 mm2 |
|
|
|
Delta scan ΔP=0%; |
|
15cm LH2 |
Yes |
2 x 2 mm2 |
|
|
|
Delta scan ΔP=+2%; |
|
15cm LH2 |
Yes |
2 x 2 mm2 |
|
|
|
Delta scan ΔP=+4%; |
- Step L3: Dummy Target Runs (with sieve slit)
Run number |
Target |
Sieve |
Raster |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Comment |
|
15cm dummy |
Yes |
2 x 2 mm2 |
|
|
|
+4% delta scan setting |