Installation Schedule
Target Installation
Other Installation (e.g.,parasitic test)
Survey Info
Beam Instrumentation
Target Positions
Spectrometer Angles
Angle |
Time |
Experiment |
Run Number Ranges |
Report |
Comment |
20 |
02/01/2017 |
MARATHON |
1111 ~ 2222 |
link |
|
Angle |
Time |
Experiment |
Run Number Ranges |
Report |
Comment |
20 |
02/01/2017 |
MARATHON |
1111 ~ 2222 |
link |
|
Commissioning Plan
Before Beam
- Beamline
- Twiddle Measurement to check BPMs (placeholder slides)
- Clock run with raster on, check and compare fastbus and Flash raster signals (placeholder slides)
- Harp Checkout/Testing
- Unser Checkout/Testing
- Beam Energy Measurements System Checkout/Testing
- Optical Radiation Monitor?
LHRS
Angle |
Momentum |
Duration |
Experiment |
Run Number Ranges |
Report |
Comment |
17.0 |
3.980 |
175 hrs |
x>1 |
1111 ~ 2222 |
link |
|
17.0 |
3.710 |
27 hrs |
x>1 |
1111 ~ 2222 |
link |
|
RHRS
Angle |
Momentum |
Time |
Experiment |
Run Number Ranges |
Report |
Comment |
28.5 |
2.910 |
132 hrs |
x>1 |
~90000 |
link |
|
28.5 |
2.715 |
75 hrs |
x>1 |
~90000 |
link |
|
28.5 |
2.530 |
38 hrs |
x>1 |
~90000 |
link |
|
- Magnets
- Decide on scaling function for Q1s (not linear!)
- Test LHRS full momentum range
- Test RHRS full momentum range
- LHRS Initial Momentum: ??.?? GeV/c
- RHRS Initial Momentum: ??.?? GeV/c
- DAQ
- LHRS DAQ machine: adaq1
- RHRS DAQ machine: adaq2
- Currently Functional online analysis machines: adaq3
- Keep only necessary CODA configurations
- Setup/Test remote power cycle of all crates
- Software
- Demonstrate/write-up new Strip Chart procedure
- Verify BTA functionality
- Demonstrate working Podd1.6, ROOT6, replay and online plots with cosmics
- Demonstrate updated spotL/spotR code (take special run with clock trigger and raster on)
- Demonstrate updated online liveTime calculations with cosmics/clock
With First Beam
- Beamline
- Beam Centering
- Raster Size Calibration
- BPM Calibration (pedestal run, Bullseye scan)
- BCM Calibration
- ARC Energy Measurement (parasitic only)
- Trigger Timing Checkout
- Detector Checkout with single foil, multi foils, and target cells
- VDC wire hits and efficiencies
- TDC distributions of scintillators, VDCs, and GC
- fastbus ADC distributions of scintillators, GC, and calorimeters
- FlashADC distributions of scintillators and GC
- Check all scalers
- check thresholds
- Boiling Study at 17 degree on 3H, 3He, 2H, H targets and empty cell
- HRS Optics with saturated Q1 (LHRS p0>3 GeV, RHRS?)
- Multifoil target:
- one DIS run without sieve for y-target calibration
- sieve on, take a long DIS run for theta, phi calibration
- Hydrogen target: elastic peak check (move RHRS to a larger angle), and delta scan at +-2%, +-4% of elastic peak
- Detector Calibrations
Commissioning Results
BPM calibration runs (Bull's eye scan)
Relative position |
LHRS CODA run |
RHRS CODA run |
Harp scan entry no. |
(0,0) |
|
|
|
(2,2) |
|
|
|
(2,-2) |
|
|
|
(-2,-2) |
|
|
|
(-2,2) |
|
|
|
(3,3) |
|
|
|
(-3,-3) |
|
|
|
BCM calibration runs
Beam Current (uA) |
LHRS CODA run |
RHRS CODA run |
BCM logger |
Comments |
5 |
|
|
|
|
10 |
|
|
|
|
15 |
|
|
|
|
20 |
|
|
|
|
25 |
|
|
|
|
Target Boiling Study
Run number |
Target |
Beam Current |
Raster Size |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Comment |
|
H3 |
25uA |
2x2 cm |
|
|
|
|
|
H3 |
15uA |
2x2 cm |
|
|
|
|
|
H3 |
5uA |
2x2 cm |
|
|
|
|
Run number |
Target |
Beam Current |
Raster Size |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Comment |
|
He3 |
25uA |
2x2 cm |
|
|
|
|
|
He3 |
15uA |
2x2 mm |
|
|
|
|
|
He3 |
5uA |
2x2 cm |
|
|
|
|
- C12 target for a normalization check for beam-current dependent rate check.
Run number |
Target |
Beam Current |
Raster Size |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Comment |
|
Carbon-Foil |
25uA |
2x2 mm |
|
|
|
|
|
Carbon-Foil |
15uA |
2x2 mm |
|
|
|
|
|
Carbon-Foil |
5uA |
2x2 mm |
|
|
|
|
Beam Energy Measurements
Energy of central ray (MeV) |
Dispersive mode |
Halog entry |
11000.00 |
|
|
4400 |
|
|
2200 |
|
|
Dedicated Commissioning Plans
(ee'K) Hypernucleus