Target Boiling Study
Jump to navigation
Jump to search
Back to Installation and Commissioning
- E0 = 2.2 GeV
- HRS-L: Ep = 2.00 GeV/c, Theta = 17 Degrees
- HRS-R: Ep = 1.78 GeV/c, Theta = 26 Degrees
- Raster On* (2.5mmx2mm MCC = 2mmx2mm on target)
- Empty-Cell Target
Run number | Target | Beam Current | Comment |
891 | Empty Cell | 22.5uA | 100K Events after cut |VZ|<7.5cm |
924 | Empty Cell | 5uA | 100K Events after cut |VZ|<7.5cm |
- For the rest of the run, take 100K Events for each run after cutting |VZ|<7.5cm. (Will update this number with a correction factor from the Empty-Target Cell run)
- H1 Target
Run number | Target | Beam Current | Comment |
895-894 | H1 | 22.5uA | |
896 | H1 | 15uA | |
897 | H1 | 10uA | |
899 | H1 | 5uA | |
901 | H1 | 2.5uA |
- D2 Target
Run number | Target | Beam Current | Comment |
923 | D2 | 22.5uA | |
921 | D2 | 15uA | |
920 | D2 | 10uA | |
918 | D2 | 5uA | |
919 | D2 | 2.5uA |
- H3 Target
Run number | Target | Beam Current | Comment |
911 | H3 | 22.5uA | |
910 | H3 | 15uA | |
908,909 | H3 | 10uA | |
904 | H3 | 5uA | |
902 | H3 | 2.5uA | |
907 | H3 | 1uA |
- He3 Target
Run number | Target | Beam Current | Comment |
912 | He3 | 22.5uA | |
913 | He3 | 15uA | |
914 | He3 | 10uA | |
915 | He3 | 5uA | |
916 | He3 | 2.5uA |
- C12 Target
Run number | Target | Beam Current | Comment |
C12 | 22.5uA | ||
C12 | 15uA | ||
C12 | 10uA | ||
925 | C12 | 5uA | |
C12 | 2.5uA |