Run Plan From Run Coordinator
Jan 14 Swing
- Finish Kin1 running (see whiteboard)
- Angle change
- Call Tech On Call a little in advance
- Set both spectrometers to 19.135deg (TECHS ONLY)
- FADC Window Check (expert only: [Link])
- Begin Kin2 (always use PS1=PS2=PS3=1 (unless otherwise specified))
- Carbon Hole centering check
- Home, 10uA, 10 minutes
- multifoil, 10 uA, 10 minutes
- carbon, 20 uA, 10 minutes
- carbon, 20 uA, only PS8=100, 5 minutes
- Empty Cell, 20uA, 30 minutes
- 3He Cell, 20uA, 1hr 40min
- 1H Cell, 20uA, 40min
- 2H Cell, 20uA, 40min
- 3H Cell, 1hr 20min
- Empty Cell, 20uA, 30 minutes
- 3He Cell, 20uA, 1hr 40min
- 1H Cell, 20uA, 40min
- 2H Cell, 20uA, 40min
- 3H Cell, 1hr 20min
Jan 13 Day
- Carbon Hole centering (with Meekins adjusting encoder values)
- Check distance from centered on hole to collimator edge, change only BPMBx (should be nearby in positive BPMx)
- Raster size fine tuning
- Harp scan with raster on (clock trigger only)
- BPM pedestal run (Call in Jason)
- Bullseye scan (with Jason)
- Trigger checkout (Florian looking a remote scopes)
- Prescale/deadtime checks with dummy target
- DAQ checkout (shifters/experts check online plots)
- optics data:
- Single-Foil Carbon, raster off
- Single-Foil Carbon, raster on
- Multi-Foil Carbon, raster off
- Multi-Foil Carbon, raster on
- If still waiting for gas cell permission:
- Dummy Target, 10uA, raster on
Jan 12 Swing
- Hall Access --Completed
- Collimator edge-finding --completed
- clock run for BPM sanity check
- Bogdan's raster target edge-finding sanity check
- carbon hole finding/centering (see how close we can get, may need to ask for BPMBx != BPMAx in order to avoid collimator)
- Continue with the Commissioning Plan: [1]
- Do not skip the bullseye scan (even though we took one harp scan earlier today)
- Doug will do the Arc energy measurement sometime this weekend. (Don't call him for this in the middle of the night...)
- If startup procedure is completed, take 5uA runs, 30 min each:
- Single-Foil Carbon, raster off
- Single-Foil Carbon, raster on
- Multi-Foil Carbon, raster off
- Multi-Foil Carbon, raster on
- If still waiting for gas cell permission:
- Dummy Target, 10uA, raster on
Jan 12 Owl
- Follow Startup Procedure: https://wiki.jlab.org/tegwiki/index.php/Additional_Installation_and_Commissioning
- HALOG EVERYTHING
- If startup procedure is completed, take 5uA runs, 30 min each:
- Single-Foil Carbon, raster off
- Single-Foil Carbon, raster at nominal
- Multi-Foil Carbon, raster off
- Multi-Foil Carbon, raster at Nominal
Jan 11 Swing
- Monitor the target
- Check that RHRS and LHRS are at 15.577deg and 3.1 GeV
- Take Cosmics on both arms until beam setup begins
- coordinate with MCC for 5th pass beam setup!
Dec 16 Owl Shift
- Finish the Boiling Study
- ~1am: access to move LHRS to 22deg
- Run on 3H, 3He, 1H, 2H, and empty cell until Day Shift
Dec 15 Swing Shift
- See WhiteBoard
- Boiling Study: [2]
Dec 15 Day Shift
- Remove Sieve from LHRS
- Run Dummy with nominal raster at I = 22.5, 15, 10, 5, 2.5 uA -- 2 million events each (~15 minutes @ 2kHz)
- FADC threshold check
- Run Multifoil with nominal raster at I = 22.5, 15, 10, 5, 2.5 uA -- 1 million events each (~15 minutes @ 2kHz)
- Access begins at 1pm https://logbooks.jlab.org/entry/3505097
- When gas cell running is approved:
- call RC
- begin target boiling study [3]
Other Links
- Commissioning timetable (google sheet)
Brief but reflects the exact runplan.
- Commissioning How-to (wiki)
Documentation and details. Could be out-of-date. Please always check with run coordinator and student experts.