Run Meeting: April 20th, 2018

From Tritium Experiments Group
Revision as of 14:59, 20 April 2018 by Efuchey (talk | contribs) (→‎e'p)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Back to:

Main Page
Daily Run Meetings

4:00PM Run Meeting, Counting house meeting room (200C)

RC: Eric Fuchey

(shifts)

e'p

Smooth data taking during the last 24h. There were only minor beam issues i.e a change in the 2nd pass separator phase.

Collected statistics: 2.3 C < charge < 2.4 C on each target at run 100255.

Down times:

injector problem (Gun HV Air Pressure Fault - bad solenoid): ~1h30 total;
2pass separator phase drift (~30 minutes)
adaq1 freezing issue + subsequent DAQ trouble: ~30 minutes down.

Slides


BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653