Fall-2018 BPM Calibration
Jump to navigation
Jump to search
BPM Calibrations (Bullseye Scan) [1-2 hours]
This calibration was done in the owl shift of 09/27/2018 using both arms DAQ, however the Right arm dipole wasn't enabled. Set Beam energy (MeV) : 10618 Current ~5 uA
Bulls eye scan for 12/14/2017
Relative position | LHRS CODA run | RHRS CODA run | Harp scan entry no. | HarpA time stamp | HarpB time stamp |
(1.4,1.8) | 3436 | 93479 | 3598652 3598655 | 09272018_00:45:46 | 09272015_00:47:39 |
(1.7,2.8) | 3437 | 93480 | 3598662 3598663 | 9272015_00:57:17 | 9272015_00:59:26 |
(0.4,2.8) | 807 | 90597 | 3504130 | 12142017_02:49:00 | 12142017_02:52:45 |
(0.4,0.8) | 808 | 90598 | 3504140 | 12142017_02:57:48 | 12142017_02:59:33 |
(2.4,0.8) | 809 | 90599 | 3504146 | 12142017_03:04:43 | 12142017_03:08:13 |
(1.4,1.8) | 810 | 90600 | 3504151 | 12142017_03:17:15 | 12142017_03:19:01 |