Run Meeting: Oct 25th, 2018
Jump to navigation
Jump to search
Back to:
3:30PM Run Meeting, Counting house meeting room (200C)
RC: Carlos Ayerbe
Summary of past 24h:
Accelerator
- beam studies
- tune beam ~20:00-01:00
- Phase Studies 2:00 -...
Swing shift
- elastics runs from tune beam
Owl shift
- finish elastics
- LQ3 quench
Day shift
- no beam
- controlled access
- Jessie, Jack and Heidi entered to check LQ3 issue.
- Left arm restored. Right arm is powered (Dipole) low current (100 A) just for investigating its behaviour.
- ~14:30 Hall in beam permit
Plan:
- expected beam at Swing shift.
Slides/Links
MCC scheduling Whiteboard: http://accboard.acc.jlab.org/
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/372278653