Run Meeting: Nov 12th, 2018
Back to:
3:30PM Run Meeting, Counting house meeting room (200C)
RC: Jason Bane
Summary of past 24h:
Over the weekend we got a little less then 27 hours of Beam on Target, about 50%!!
On Alex's behave R. Michaels used the down time to enter the Hall and place some filler panels into the VME crate to help cooling of the FADCs and F1tdcs.
As we were getting beam back in the machine, had a drop of the south linac PSS, which had dropped that section to an indeterminate state. It will need to be dropped to restricted and reswept. After that the RF needs to be brought back online, so we are looking at approx. 1630ish before beam back again.
Update to Hydrogen Analysis:
https://logbooks.jlab.org/entry/3625108
Slides/Links
MCC scheduling Whiteboard: http://accboard.acc.jlab.org/
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/
Tritium wiki page: https://wiki.jlab.org/tegwiki/index.php/Main_Page
Bluejeans connection information
To join the Meeting: https://bluejeans.com/256205934
To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934
To join via phone : 1) Dial:
+1.408.740.7256 (United States) +1.888.240.2560 (US Toll Free) +1.408.317.9253 (Alternate number) (see all numbers - http://bluejeans.com/numbers)
2) Enter Conference ID : 256205934