Run Meeting: Nov 12th, 2018

From Tritium Experiments Group
Revision as of 15:26, 12 November 2018 by Jbane (talk | contribs) (→‎Summary of past 24h:)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Back to:

Main Page
Daily Run Meetings

3:30PM Run Meeting, Counting house meeting room (200C)

RC: Jason Bane

Summary of past 24h:

  • On Alex's behave R. Michaels used the down time to enter the Hall and place some filler panels into the VME crate to help cooling of the FADCs and F1tdcs.
  • During the downtime: Changed to Tritium Kinematics.
    • Will take data on Hydrogen for a dew days.
  • As we were getting beam back in the machine, had a drop of the south linac PSS, which had dropped that section to an indeterminate state. It will need to be dropped to restricted and re-swept. After that the RF needs to be brought back online, so we are looking at approx. 1630ish before beam back again.


Slides/Links

MCC scheduling Whiteboard: http://accboard.acc.jlab.org/

Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/

Tritium wiki page: https://wiki.jlab.org/tegwiki/index.php/Main_Page

Bluejeans connection information

To join the Meeting: https://bluejeans.com/256205934

To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934

To join via phone : 1) Dial:

  +1.408.740.7256 (United States)
  +1.888.240.2560 (US Toll Free)
  +1.408.317.9253 (Alternate number)
  (see all numbers - http://bluejeans.com/numbers)

2) Enter Conference ID : 256205934