Installation Plan and Commissioning Plan Page (Back to Tritium-Main)

Installation Schedule

Commissioning Schedule

BPM calibration runs (Bull's eye scan)

Relative position LHRS CODA run RHRS CODA run Harp scan entry no.
(0,0)
(2,2)
(2,-2)
(-2,-2)
(-2,2)
(3,3)
(-3,-3)

BCM calibration runs

LHRS CODA run RHRS CODA run BCM logger Comments

Optics commissioning runs

  • LHRS optics runs
  • Step L1: Procedure with Sieve-slit
Run number Target Sieve Raster Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
Multi-foil carbon Yes Off
15cm LH2 Yes 2 x 2 mm2
Multi-foil carbon Yes Off
  • Step L2: Delta Scan with Proton Elastic (with sieve slit)
Run number Target Sieve Raster Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
15cm LH2 Yes 2 x 2 mm2 Delta scan ΔP=-4%;
15cm LH2 Yes 2 x 2 mm2 Delta scan ΔP=-2%;
15cm LH2 Yes 2 x 2 mm2 Delta scan ΔP=0%;
15cm LH2 Yes 2 x 2 mm2 Delta scan ΔP=+2%;
15cm LH2 Yes 2 x 2 mm2 Delta scan ΔP=+4%;
  • Step L3: Dummy Target Runs (with sieve slit)
Run number Target Sieve Raster Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
15cm dummy Yes 2 x 2 mm2 +4% delta scan setting