Installation Plan and Commissioning Plan Page (Back to Tritium-Main)
Installation Schedule
Commissioning Schedule
BPM calibration runs (Bull's eye scan)
Relative position |
LHRS CODA run |
RHRS CODA run |
Harp scan entry no. |
(0,0) |
|
|
|
(2,2) |
|
|
|
(2,-2) |
|
|
|
(-2,-2) |
|
|
|
(-2,2) |
|
|
|
(3,3) |
|
|
|
(-3,-3) |
|
|
|
BCM calibration runs
LHRS CODA run |
RHRS CODA run |
BCM logger |
Comments |
|
|
|
|
|
|
|
|
Optics commissioning runs
- LHRS optics runs
- Step L1: Procedure with Sieve-slit
Run number |
Target |
Sieve |
Raster |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Comment |
|
Multi-foil carbon |
Yes |
Off |
|
|
|
|
|
15cm LH2 |
Yes |
2 x 2 mm2 |
|
|
|
|
|
Multi-foil carbon |
Yes |
Off |
|
|
|
|
- Step L2: Delta Scan with Proton Elastic (with sieve slit)
Run number |
Target |
Sieve |
Raster |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Comment |
|
15cm LH2 |
Yes |
2 x 2 mm2 |
|
|
|
Delta scan ΔP=-4%; |
|
15cm LH2 |
Yes |
2 x 2 mm2 |
|
|
|
Delta scan ΔP=-2%; |
|
15cm LH2 |
Yes |
2 x 2 mm2 |
|
|
|
Delta scan ΔP=0%; |
|
15cm LH2 |
Yes |
2 x 2 mm2 |
|
|
|
Delta scan ΔP=+2%; |
|
15cm LH2 |
Yes |
2 x 2 mm2 |
|
|
|
Delta scan ΔP=+4%; |
- Step L3: Dummy Target Runs (with sieve slit)
Run number |
Target |
Sieve |
Raster |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Comment |
|
15cm dummy |
Yes |
2 x 2 mm2 |
|
|
|
+4% delta scan setting |
- Step L4: Proton Elastic Kinematics
Run number |
Target |
Sieve |
Raster |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Comment |
|
Single-foil carbon |
No |
Off |
|
|
|
|
|
15cm dummy |
No |
2 x 2 mm2 |
|
|
|
|
|
15cm LH2 |
No |
2 x 2 mm2 |
|
|
|
|
Optics commissioning runs
- RHRS optics runs
- Step R1: Procedure with Sieve-slit
Run number |
Target |
Sieve |
Raster |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Comment |
|
Multi-foil carbon |
Yes |
Off |
|
|
|
|
|
15cm LH2 |
Yes |
2 x 2 mm2 |
|
|
|
|
|
Multi-foil carbon |
Yes |
Off |
|
|
|
|
- Step R2: Delta Scan with Proton Elastic (with sieve slit)
Run number |
Target |
Sieve |
Raster |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Comment |
|
15cm LH2 |
Yes |
2 x 2 mm2 |
|
|
|
Delta scan ΔP=-4%; |
|
15cm LH2 |
Yes |
2 x 2 mm2 |
|
|
|
Delta scan ΔP=-2%; |
|
15cm LH2 |
Yes |
2 x 2 mm2 |
|
|
|
Delta scan ΔP=0%; |
|
15cm LH2 |
Yes |
2 x 2 mm2 |
|
|
|
Delta scan ΔP=+2%; |
|
15cm LH2 |
Yes |
2 x 2 mm2 |
|
|
|
Delta scan ΔP=+4%; |
- Step R3: Dummy Target Runs (with sieve slit)
Run number |
Target |
Sieve |
Raster |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Comment |
|
15cm dummy |
Yes |
2 x 2 mm2 |
|
|
|
+4% delta scan setting |
- Step R4: Proton Elastic Kinematics
Run number |
Target |
Sieve |
Raster |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Comment |
|
Single-foil carbon |
No |
Off |
|
|
|
|
|
15cm dummy |
No |
2 x 2 mm2 |
|
|
|
|
|
15cm LH2 |
No |
2 x 2 mm2 |
|
|
|
|
Target Boiling Study
Run number |
Target |
Beam Current |
Raster Size |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Comment |
|
H3 |
25uA |
2x2 cm |
|
|
|
|
|
H3 |
15uA |
2x2 cm |
|
|
|
|
|
H3 |
5uA |
2x2 cm |
|
|
|
|
Run number |
Target |
Beam Current |
Raster Size |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Comment |
|
He3 |
25uA |
2x2 cm |
|
|
|
|
|
He3 |
15uA |
2x2 cm |
|
|
|
|
|
He3 |
5uA |
2x2 cm |
|
|
|
|