Installation Plan and Commissioning Plan Page (Back to Tritium-Main)
Installation Schedule
Target Installation
Other Installation (e.g.,parasitic test)
Survey Info
Beam Instrumentation
Target Positions
Spectrometer Angles
Angle |
Time |
Experiment |
Run Number Ranges |
Report |
Comment |
20 |
02/01/2017 |
MARATHON |
1111 ~ 2222 |
link |
|
Angle |
Time |
Experiment |
Run Number Ranges |
Report |
Comment |
20 |
02/01/2017 |
MARATHON |
1111 ~ 2222 |
link |
|
Commissioning Schedule
BPM calibration runs (Bull's eye scan)
Relative position |
LHRS CODA run |
RHRS CODA run |
Harp scan entry no. |
(0,0) |
|
|
|
(2,2) |
|
|
|
(2,-2) |
|
|
|
(-2,-2) |
|
|
|
(-2,2) |
|
|
|
(3,3) |
|
|
|
(-3,-3) |
|
|
|
BCM calibration runs
LHRS CODA run |
RHRS CODA run |
BCM logger |
Comments |
|
|
|
|
|
|
|
|
Target Boiling Study
Run number |
Target |
Beam Current |
Raster Size |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Comment |
|
H3 |
25uA |
2x2 cm |
|
|
|
|
|
H3 |
15uA |
2x2 cm |
|
|
|
|
|
H3 |
5uA |
2x2 cm |
|
|
|
|
Run number |
Target |
Beam Current |
Raster Size |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Comment |
|
He3 |
25uA |
2x2 cm |
|
|
|
|
|
He3 |
15uA |
2x2 cm |
|
|
|
|
|
He3 |
5uA |
2x2 cm |
|
|
|
|
- C12 target for a normalization check for beam-current dependent rate check.
Run number |
Target |
Beam Current |
Raster Size |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Comment |
|
Carbon-Foil |
25uA |
2x2 cm |
|
|
|
|
|
Carbon-Foil |
15uA |
2x2 cm |
|
|
|
|
|
Carbon-Foil |
5uA |
2x2 cm |
|
|
|
|
Beam Energy Measurements
Energy of central ray (MeV) |
Dispersive mode |
Halog entry |
11000.00 |
|
|
4400 |
|
|
2200 |
|
|