File:RHRS DAQmaps april17.pptx
Revision as of 15:44, 1 July 2017 by Hauenst (talk | contribs) (Overview over cable connections in the right electronic rack on the RHRS after the Argon beam time in spring 2017 and before the tritium setup. The connections include TS, TM, Retiming cables as well as all NIM modules. The setup will be cleaned for tr...)
RHRS_DAQmaps_april17.pptx (file size: 126 KB, MIME type: application/vnd.openxmlformats-officedocument.presentationml.presentation)
Warning: This file type may contain malicious code. By executing it, your system may be compromised.
Overview over cable connections in the right electronic rack on the RHRS after the Argon beam time in spring 2017 and before the tritium setup. The connections include TS, TM, Retiming cables as well as all NIM modules. The setup will be cleaned for tritium run in fall17/spring18
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Dimensions | User | Comment | |
---|---|---|---|---|
current | 15:44, 1 July 2017 | (126 KB) | Hauenst (talk | contribs) | Overview over cable connections in the right electronic rack on the RHRS after the Argon beam time in spring 2017 and before the tritium setup. The connections include TS, TM, Retiming cables as well as all NIM modules. The setup will be cleaned for tr... |
You cannot overwrite this file.
File usage
There are no pages that use this file.