Difference between revisions of "2017 Fall Run"

From Tritium Experiments Group
Jump to navigation Jump to search
m
 
(4 intermediate revisions by one other user not shown)
Line 2: Line 2:
  
 
= [[Installation and Commissioning]]=
 
= [[Installation and Commissioning]]=
 +
= [[ SRC Production Run]]=
 
= [[HRS Detector Checkout and Calibration]]=
 
= [[HRS Detector Checkout and Calibration]]=
 
= [[Data Acquisition System and Triggers]]=
 
= [[Data Acquisition System and Triggers]]=
= [[Boiling Study]]=
+
= [https://wiki.jlab.org/tegwiki/index.php/Target_Boiling_Study Boiling Study]=
= [[BCM Calibration]]=
+
 
= [[BPM Calibration]] (including Raster)=
+
= [https://wiki.jlab.org/tegwiki/index.php/BCM_Calibration BCM Calibration]=
 +
 
 +
= [https://wiki.jlab.org/tegwiki/index.php/BPM_Calibration BPM Calibration] (including Raster)=
 +
 
 
= [[Optics Calibration]]=
 
= [[Optics Calibration]]=
= [[ SRC Production Run]]=
+
= [[Production Data]]=

Latest revision as of 22:39, 17 January 2018