==== BPM Calibrations (Bullseye Scan) [1-2 hours]====
 +
<FONT Color="Green">How to perform a bulls eye scan</FONT>:
 +
 
 +
1.  You need unrastered beam:
 +
    - <FONT Color="red">caution you should not do this with a target requiring rastered beam</FONT>
 +
    - use carbon, optics, or in the worst case empty instead
 +
 
 +
2.  Ask MCC to steer the beam to the nominal center of the target.
 +
 
 +
3.  Wait until beam is stable and have MCC perform a harp scan for the two superharps near the target (1H04A and 1H04B) and take a CODA run for both the left and right spectrometers during the same time. Start the coda run first before asking MCC.  Request MCC to make an ELOG entry with the Harp results, you should see all three harp wires.  Record ELOG entry numbers.
 +
 
 +
4.  Ask MCC then to steer the beam to positions around the nominal center:
 +
    - cover at least the area the raster will cover: (2,2), (2,-2), (-2,-2), (-2,2), (3,3), (-3,-3), and repeat (0,0)
 +
    - repeat harp and CODA runs for each position
 +
 
 +
5.  Record Harp scan run numbers and corresponding CODA run number for each beam position.  As an example, see HALOG # [https://logbooks.jlab.org/entry/3324009 3324009].
 +
 
 +
6.  Make a record of the harp scans and CODA runs in the HALOG.
 +
 
 +
<FONT Color="Green">How to analyze the bulls eye scan</FONT>:
 +
  - detailed instructions can be found at the [http://hallaweb.jlab.org/root/doc/bpm.html Analyzing BPMs] website.
 +
  - <FONT Color="red">the shift crew is not expected to analyze the bulls eye scan</FONT>.
  
 
==Calibration==
 
==Calibration==
  
 
GMP completed a BPM calibration run early this fall run period. The results of the Bull's eye scan can be found on the Halla [https://logbooks.jlab.org/entry/3427815 LogBook].
 
GMP completed a BPM calibration run early this fall run period. The results of the Bull's eye scan can be found on the Halla [https://logbooks.jlab.org/entry/3427815 LogBook].

Revision as of 14:36, 5 October 2017

Back to Tritium-Main


(Copied from GMp)

BPM Calibrations (Bullseye Scan) [1-2 hours]

How to perform a bulls eye scan:

1. You need unrastered beam:

    - caution you should not do this with a target requiring rastered beam
    - use carbon, optics, or in the worst case empty instead

2. Ask MCC to steer the beam to the nominal center of the target.

3. Wait until beam is stable and have MCC perform a harp scan for the two superharps near the target (1H04A and 1H04B) and take a CODA run for both the left and right spectrometers during the same time. Start the coda run first before asking MCC. Request MCC to make an ELOG entry with the Harp results, you should see all three harp wires. Record ELOG entry numbers.

4. Ask MCC then to steer the beam to positions around the nominal center:

    - cover at least the area the raster will cover: (2,2), (2,-2), (-2,-2), (-2,2), (3,3), (-3,-3), and repeat (0,0)
    - repeat harp and CODA runs for each position

5. Record Harp scan run numbers and corresponding CODA run number for each beam position. As an example, see HALOG # 3324009.

6. Make a record of the harp scans and CODA runs in the HALOG.

How to analyze the bulls eye scan:

 - detailed instructions can be found at the Analyzing BPMs website.
 - the shift crew is not expected to analyze the bulls eye scan.

Calibration