Difference between revisions of "Detector Checkout with single foil, multi foils, and target cells"

From Tritium Experiments Group
Jump to navigation Jump to search
m
m
 
Line 1: Line 1:
[https://wiki.jlab.org/tegwiki/index.php/Installation_and_Commissioning <b>Back to Installation and Commissioning</b>]
+
[https://wiki.jlab.org/tegwiki/index.php/Additional_Installation_and_Commissioning <b>Back to Installation and Commissioning</b>]
  
 
  <ol>
 
  <ol>

Latest revision as of 18:54, 13 January 2018

Back to Installation and Commissioning

  1. VDC wire hits and efficiencies
  2. TDC distributions of scintillators, VDCs, and GC
  3. fastbus ADC distributions of scintillators, GC, and calorimeters
  4. FlashADC distributions of scintillators and GC
  5. Check all scalers
  6. check thresholds


Detector-Checkout Runs

Run-No E' Theta (Degree) Targets Current Prescale Total Events Comments
0000 3.10 17.58 H3 22.5 1/1/1 25000?

Optics Runs

Run-No E' Theta (Degree) Targets Current Prescale Total Events Comments
0000 3.10 17.58 H3 22.5 1/1/1 25000?