Detector Checkout with single foil, multi foils, and target cells

From Tritium Experiments Group
Revision as of 19:29, 29 November 2017 by Yez (talk | contribs) (Created page with "[https://wiki.jlab.org/tegwiki/index.php/Installation_and_Commissioning <b>Back to Installation and Commissioning</b>] <ol> <li> VDC wire hits and efficiencies <li> TDC...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Back to Installation and Commissioning

  1. VDC wire hits and efficiencies
  2. TDC distributions of scintillators, VDCs, and GC
  3. fastbus ADC distributions of scintillators, GC, and calorimeters
  4. FlashADC distributions of scintillators and GC
  5. Check all scalers
  6. check thresholds