Difference between revisions of "Fall-2018 BPM Calibration"

From Tritium Experiments Group
Jump to navigation Jump to search
Line 81: Line 81:
  
 
===Harp Reuslts===
 
===Harp Reuslts===
 +
Run xpos(A)  ypos(A) xpos(B)  ypos(B)
 +
1  0.364446  2.14998 0.0483641 2.77635
 +
2  0.0186845  3.25808 -0.254956 3.8623
 +
3  1.45294    3.24767 1.04559  3.85055
 +
4  1.3509    1.00581 0.996061  1.66498
 +
5  -0.0147979 1.03717 -0.272135 1.6795
 +
6  0.288062  2.18488 0.0274984 2.802
 +
 +
  
 
[[All plots]]
 
[[All plots]]

Revision as of 11:48, 27 September 2018

BPM Calibrations (Bullseye Scan) [1-2 hours]

This calibration was done in the owl shift of 09/27/2018 using both arms DAQ, however the Right arm dipole wasn't enabled. Set Beam energy (MeV) : 10618 Current ~5 uA Pedestal Run Forced Gain = 0: LHRS = 3442 and RHRS= 93485 Bulls eye scan for 12/14/2017

Relative position LHRS CODA run RHRS CODA run Harp scan entry no. HarpA time stamp HarpB time stamp
(1.4,1.8) 3436 93479 3598652 3598655 09272018_00:45:46 09272018_00:47:39
(1.7,2.8) 3437 93480 3598662 3598663 09272018_00:57:17 09272018_00:59:26
(0.4,2.8) 3438 93481 3598677 3598678 09272018_01:19:59 09272018_01:21:56
(0.4,0.8) 3439 93482 3598682 3598687 09272018_01:28:09 09272018_01:34:08
(1.7,0.8) 3440 93483 3598699 <3598700 09272018_01:44:51 09272018_01:47:05
(1.4,1.8) 3441 93484 3598707 3598709 09272018_01:58:39 09272018_02:00:35



Calibration Results

Pedestals

BPMB BMPB pedestals from 09272018

BPMA BMPA pedestals from 09272018

Harp Reuslts

Run xpos(A) ypos(A) xpos(B) ypos(B) 1 0.364446 2.14998 0.0483641 2.77635 2 0.0186845 3.25808 -0.254956 3.8623 3 1.45294 3.24767 1.04559 3.85055 4 1.3509 1.00581 0.996061 1.66498 5 -0.0147979 1.03717 -0.272135 1.6795 6 0.288062 2.18488 0.0274984 2.802


All plots HarpA1 09272018.png

Calibration results