Fall-2018 BPM Calibration

From Tritium Experiments Group
Revision as of 01:39, 27 September 2018 by Ssanties (talk | contribs)
Jump to navigation Jump to search

BPM Calibrations (Bullseye Scan) [1-2 hours]

This calibration was done in the owl shift of 09/27/2018 using both arms DAQ, however the Right arm dipole wasn't enabled. Set Beam energy (MeV) : 10618 Current ~5 uA

Bulls eye scan for 12/14/2017

Relative position LHRS CODA run RHRS CODA run Harp scan entry no. HarpA time stamp HarpB time stamp
(1.4,1.8) 3436 93479 3598652 3598655 09272018_00:45:46 09272018_00:47:39
(1.7,2.8) 3437 93480 3598662 3598663 09272018_00:57:17 09272018_00:59:26
(0.4,2.8) 3438 93481 3598677 3598678 09272018_01:19:59 09272018_01:21:56
(0.4,0.8) 3439 93482 https://logbooks.jlab.org/entry/3598682 3598682] 3598687 09272018_01:28:09 09272018_01:34:08
(2.4,0.8) 809 90599 3598682 12142017_03:04:43 12142017_03:08:13
(1.4,1.8) 810 90600 3504151 12142017_03:17:15 12142017_03:19:01