Difference between revisions of "Installation and Commissioning"

From Tritium Experiments Group
Jump to navigation Jump to search
Line 433: Line 433:
  
 
=== Target Boiling Study ===
 
=== Target Boiling Study ===
 
+
* <b>Carbon-Foil Target</b>
* <b>H3 Target</b>
 
 
<table border="1"  style="width:80%">
 
<table border="1"  style="width:80%">
 
   <tr>
 
   <tr>
Line 448: Line 447:
 
   <tr>
 
   <tr>
 
     <td> </td>
 
     <td> </td>
     <td>H3</td>
+
     <td>Carbon-Foil</td>
 
     <td>25uA</td>
 
     <td>25uA</td>
 
     <td>2x2 cm</td>
 
     <td>2x2 cm</td>
Line 458: Line 457:
 
   <tr>
 
   <tr>
 
     <td> </td>
 
     <td> </td>
     <td>H3</td>
+
     <td>Carbon-Foil</td>
 
     <td>15uA</td>
 
     <td>15uA</td>
 
     <td>2x2 cm</td>
 
     <td>2x2 cm</td>
Line 468: Line 467:
 
   <tr>
 
   <tr>
 
     <td> </td>
 
     <td> </td>
     <td>H3</td>
+
     <td>Carbon-Foil</td>
    <td>5uA</td>
 
    <td>2x2 cm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
 
* <b>He3 Target</b>
 
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>Run number</td>
 
    <td>Target</td>
 
    <td>Beam Current</td>
 
    <td>Raster Size </td>
 
    <td>E<SUB>beam</SUB> [GeV]</td>
 
    <td>P<SUB>0</SUB> [GeV/c]</td>
 
    <td>&theta;<SUB>e</SUB> [deg]</td>
 
    <td>Comment</td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>He3</td>
 
    <td>25uA</td>
 
    <td>2x2 cm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>He3</td>
 
    <td>15uA</td>
 
    <td>2x2 cm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>He3</td>
 
 
     <td>5uA</td>
 
     <td>5uA</td>
 
     <td>2x2 cm</td>
 
     <td>2x2 cm</td>

Revision as of 17:28, 15 November 2016

Installation Plan and Commissioning Plan Page (Back to Tritium-Main)

Installation Schedule

Commissioning Schedule

BPM calibration runs (Bull's eye scan)

Relative position LHRS CODA run RHRS CODA run Harp scan entry no.
(0,0)
(2,2)
(2,-2)
(-2,-2)
(-2,2)
(3,3)
(-3,-3)

BCM calibration runs

LHRS CODA run RHRS CODA run BCM logger Comments

Optics commissioning runs

  • LHRS optics runs
  • Step L1: Procedure with Sieve-slit
Run number Target Sieve Raster Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
Multi-foil carbon Yes Off
15cm LH2 Yes 2 x 2 mm2
Multi-foil carbon Yes Off
  • Step L2: Delta Scan with Proton Elastic (with sieve slit)
Run number Target Sieve Raster Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
15cm LH2 Yes 2 x 2 mm2 Delta scan ΔP=-4%;
15cm LH2 Yes 2 x 2 mm2 Delta scan ΔP=-2%;
15cm LH2 Yes 2 x 2 mm2 Delta scan ΔP=0%;
15cm LH2 Yes 2 x 2 mm2 Delta scan ΔP=+2%;
15cm LH2 Yes 2 x 2 mm2 Delta scan ΔP=+4%;
  • Step L3: Dummy Target Runs (with sieve slit)
Run number Target Sieve Raster Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
15cm dummy Yes 2 x 2 mm2 +4% delta scan setting
  • Step L4: Proton Elastic Kinematics
Run number Target Sieve Raster Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
Single-foil carbon No Off
15cm dummy No 2 x 2 mm2
15cm LH2 No 2 x 2 mm2

Optics commissioning runs

  • RHRS optics runs
  • Step R1: Procedure with Sieve-slit
Run number Target Sieve Raster Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
Multi-foil carbon Yes Off
15cm LH2 Yes 2 x 2 mm2
Multi-foil carbon Yes Off
  • Step R2: Delta Scan with Proton Elastic (with sieve slit)
Run number Target Sieve Raster Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
15cm LH2 Yes 2 x 2 mm2 Delta scan ΔP=-4%;
15cm LH2 Yes 2 x 2 mm2 Delta scan ΔP=-2%;
15cm LH2 Yes 2 x 2 mm2 Delta scan ΔP=0%;
15cm LH2 Yes 2 x 2 mm2 Delta scan ΔP=+2%;
15cm LH2 Yes 2 x 2 mm2 Delta scan ΔP=+4%;
  • Step R3: Dummy Target Runs (with sieve slit)
Run number Target Sieve Raster Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
15cm dummy Yes 2 x 2 mm2 +4% delta scan setting
  • Step R4: Proton Elastic Kinematics
Run number Target Sieve Raster Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
Single-foil carbon No Off
15cm dummy No 2 x 2 mm2
15cm LH2 No 2 x 2 mm2


Target Boiling Study

  • Carbon-Foil Target
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
Carbon-Foil 25uA 2x2 cm
Carbon-Foil 15uA 2x2 cm
Carbon-Foil 5uA 2x2 cm