Difference between revisions of "Installation and Commissioning"

From Tritium Experiments Group
Jump to navigation Jump to search
m
Line 1: Line 1:
'''Installation Plan and Commissioning Plan Page'''  ([https://wiki.jlab.org/tegwiki/index.php/Main_Page <B>Back to Tritium-Main</B>])
+
[https://wiki.jlab.org/tegwiki/index.php/Main_Page <B>Back to Tritium-Main</B>]
  
 
==Installation Schedule==
 
==Installation Schedule==

Revision as of 17:59, 15 November 2016

Back to Tritium-Main

Installation Schedule

Target Installation

Other Installation (e.g.,parasitic test)

Survey Info

Beam Instrumentation

Target Positions

Spectrometer Angles

  • HRS-L
Angle Time Experiment Run Number Ranges Report Comment
20 02/01/2017 MARATHON 1111 ~ 2222 link
  • HRS-L
Angle Time Experiment Run Number Ranges Report Comment
20 02/01/2017 MARATHON 1111 ~ 2222 link

Commissioning Schedule

BPM calibration runs (Bull's eye scan)

Relative position LHRS CODA run RHRS CODA run Harp scan entry no.
(0,0)
(2,2)
(2,-2)
(-2,-2)
(-2,2)
(3,3)
(-3,-3)

BCM calibration runs

LHRS CODA run RHRS CODA run BCM logger Comments

Optics commissioning runs

Target Boiling Study

  • H3 Target
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
H3 25uA 2x2 cm
H3 15uA 2x2 cm
H3 5uA 2x2 cm
  • He3 Target
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
He3 25uA 2x2 cm
He3 15uA 2x2 cm
He3 5uA 2x2 cm


  • C12 target for a normalization check for beam-current dependent rate check.
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
Carbon-Foil 25uA 2x2 cm
Carbon-Foil 15uA 2x2 cm
Carbon-Foil 5uA 2x2 cm

Beam Energy Measurements

Energy of central ray (MeV) Dispersive mode Halog entry
11000.00
4400
2200