==Installation Schedule==
+
=Installation Schedule=
  
===Target Installation===
+
==Target Installation==
  
  
===Other Installation (e.g.,parasitic test)===
+
==Other Installation (e.g.,parasitic test)==
  
 
==Survey Info==
 
==Survey Info==
  
===Beam Instrumentation===
+
==Beam Instrumentation==
  
===Target Positions===
+
==Target Positions==
  
===Spectrometer Angles===
+
==Spectrometer Angles==
 
* <b>HRS-L</b>
 
* <b>HRS-L</b>
 
<table border="1"  style="width:80%">
 
<table border="1"  style="width:80%">
Line 55: Line 55:
 
</table>
 
</table>
  
==Commissioning Schedule==
+
=Commissioning Schedule=
=== [https://wiki.jlab.org/tegwiki/index.php/Optics_Calibration Optics commissioning runs] ===
+
== [https://wiki.jlab.org/tegwiki/index.php/Optics_Calibration Optics commissioning runs] ==
=== BPM calibration runs (Bull's eye scan) ===
+
== BPM calibration runs (Bull's eye scan) ==
 
<table border="1"  style="width:80%">
 
<table border="1"  style="width:80%">
 
   <tr>
 
   <tr>
Line 109: Line 109:
 
</table>
 
</table>
  
=== BCM calibration runs ===
+
== BCM calibration runs ==
 
<table border="1"  style="width:80%">
 
<table border="1"  style="width:80%">
 
   <tr>
 
   <tr>
Line 131: Line 131:
 
</table>
 
</table>
  
=== Target Boiling Study ===
+
== Target Boiling Study ==
 
* <b>H3 Target</b>
 
* <b>H3 Target</b>
 
<table border="1"  style="width:80%">
 
<table border="1"  style="width:80%">
Line 265: Line 265:
 
</table>
 
</table>
  
===Dedicated Commissioning Plans===
+
==Dedicated Commissioning Plans==
====[[MARATHON]]====
+
===[[MARATHON]]===
====[[Elastic]]====
+
===[[Elastic]]===
====[[(ee')]] SRC (x&gt;1) ====
+
===[[(ee')]] SRC (x&gt;1) ===
  
====[[(ee'p)]] SRC====
+
===[[(ee'p)]] SRC===
  
== Beam Energy Measurements ==
+
= Beam Energy Measurements =
 
<table border="1"  style="width:80%">
 
<table border="1"  style="width:80%">
 
   <tr>
 
   <tr>

Revision as of 16:47, 25 January 2017

Back to Tritium-Main

Installation Schedule

Target Installation

Other Installation (e.g.,parasitic test)

Survey Info

Beam Instrumentation

Target Positions

Spectrometer Angles

  • HRS-L
Angle Time Experiment Run Number Ranges Report Comment
20 02/01/2017 MARATHON 1111 ~ 2222 link
  • HRS-L
Angle Time Experiment Run Number Ranges Report Comment
20 02/01/2017 MARATHON 1111 ~ 2222 link

Commissioning Schedule

Optics commissioning runs

BPM calibration runs (Bull's eye scan)

Relative position LHRS CODA run RHRS CODA run Harp scan entry no.
(0,0)
(2,2)
(2,-2)
(-2,-2)
(-2,2)
(3,3)
(-3,-3)

BCM calibration runs

LHRS CODA run RHRS CODA run BCM logger Comments

Target Boiling Study

  • H3 Target
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
H3 25uA 2x2 cm
H3 15uA 2x2 cm
H3 5uA 2x2 cm
  • He3 Target
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
He3 25uA 2x2 cm
He3 15uA 2x2 mm
He3 5uA 2x2 cm


  • C12 target for a normalization check for beam-current dependent rate check.
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
Carbon-Foil 25uA 2x2 mm
Carbon-Foil 15uA 2x2 mm
Carbon-Foil 5uA 2x2 mm

Dedicated Commissioning Plans

MARATHON

Elastic

(ee') SRC (x>1)

(ee'p) SRC

Beam Energy Measurements

Energy of central ray (MeV) Dispersive mode Halog entry
11000.00
4400
2200