Difference between revisions of "Installation and Commissioning"

From Tritium Experiments Group
Jump to navigation Jump to search
m
m
Line 56: Line 56:
 
</table>
 
</table>
  
=Commissioning Schedule=
+
=Commissioning Plan=
 +
==Before Beam==
 +
==First Beam==
 +
 
 +
=Commissioning Results=
 
== [https://wiki.jlab.org/tegwiki/index.php/Optics_Calibration Optics commissioning runs] ==
 
== [https://wiki.jlab.org/tegwiki/index.php/Optics_Calibration Optics commissioning runs] ==
 
== BPM calibration runs (Bull's eye scan) ==
 
== BPM calibration runs (Bull's eye scan) ==

Revision as of 13:46, 21 September 2017

Back to 2017 Fall Run Plan Back to Tritium-Main

Installation Schedule

Target Installation

Other Installation (e.g.,parasitic test)

Survey Info

Beam Instrumentation

Target Positions

Spectrometer Angles

  • HRS-L
Angle Time Experiment Run Number Ranges Report Comment
20 02/01/2017 MARATHON 1111 ~ 2222 link
  • HRS-L
Angle Time Experiment Run Number Ranges Report Comment
20 02/01/2017 MARATHON 1111 ~ 2222 link

Commissioning Plan

Before Beam

First Beam

Commissioning Results

Optics commissioning runs

BPM calibration runs (Bull's eye scan)

Relative position LHRS CODA run RHRS CODA run Harp scan entry no.
(0,0)
(2,2)
(2,-2)
(-2,-2)
(-2,2)
(3,3)
(-3,-3)

BCM calibration runs

Beam Current (uA) LHRS CODA run RHRS CODA run BCM logger Comments
5
10
15
20
25

Target Boiling Study

  • H3 Target
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
H3 25uA 2x2 cm
H3 15uA 2x2 cm
H3 5uA 2x2 cm
  • He3 Target
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
He3 25uA 2x2 cm
He3 15uA 2x2 mm
He3 5uA 2x2 cm


  • C12 target for a normalization check for beam-current dependent rate check.
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
Carbon-Foil 25uA 2x2 mm
Carbon-Foil 15uA 2x2 mm
Carbon-Foil 5uA 2x2 mm

Beam Energy Measurements

Energy of central ray (MeV) Dispersive mode Halog entry
11000.00
4400
2200


Dedicated Commissioning Plans

(ee') SRC (x>1)

MARATHON

(ee'p) SRC

(ee'K) Hypernucleus