Installation Plan and Commissioning Plan Page (Back to Tritium-Main)

Installation Schedule

Survey Info

Beam Instrumentation

Target Positions

Spectrometer Angles

Commissioning Schedule

BPM calibration runs (Bull's eye scan)

Relative position LHRS CODA run RHRS CODA run Harp scan entry no.
(0,0)
(2,2)
(2,-2)
(-2,-2)
(-2,2)
(3,3)
(-3,-3)

BCM calibration runs

LHRS CODA run RHRS CODA run BCM logger Comments

Optics commissioning runs

  • LHRS optics runs
  • Step L1: Procedure with Sieve-slit
Run number Target Sieve Raster Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
Multi-foil carbon Yes Off
15cm LH2 Yes 2 x 2 mm2
Multi-foil carbon Yes Off
  • Step L2: Delta Scan with Proton Elastic (with sieve slit)
Run number Target Sieve Raster Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
15cm LH2 Yes 2 x 2 mm2 Delta scan ΔP=-4%;
15cm LH2 Yes 2 x 2 mm2 Delta scan ΔP=-2%;
15cm LH2 Yes 2 x 2 mm2 Delta scan ΔP=0%;
15cm LH2 Yes 2 x 2 mm2 Delta scan ΔP=+2%;
15cm LH2 Yes 2 x 2 mm2 Delta scan ΔP=+4%;
  • Step L3: Dummy Target Runs (with sieve slit)
Run number Target Sieve Raster Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
15cm dummy Yes 2 x 2 mm2 +4% delta scan setting
  • Step L4: Proton Elastic Kinematics
Run number Target Sieve Raster Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
Single-foil carbon No Off
15cm dummy No 2 x 2 mm2
15cm LH2 No 2 x 2 mm2


  • RHRS optics runs
  • Step R1: Procedure with Sieve-slit
Run number Target Sieve Raster Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
Multi-foil carbon Yes Off
15cm LH2 Yes 2 x 2 mm2
Multi-foil carbon Yes Off
  • Step R2: Delta Scan with Proton Elastic (with sieve slit)
Run number Target Sieve Raster Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
15cm LH2 Yes 2 x 2 mm2 Delta scan ΔP=-4%;
15cm LH2 Yes 2 x 2 mm2 Delta scan ΔP=-2%;
15cm LH2 Yes 2 x 2 mm2 Delta scan ΔP=0%;
15cm LH2 Yes 2 x 2 mm2 Delta scan ΔP=+2%;
15cm LH2 Yes 2 x 2 mm2 Delta scan ΔP=+4%;
  • Step R3: Dummy Target Runs (with sieve slit)
Run number Target Sieve Raster Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
15cm dummy Yes 2 x 2 mm2 +4% delta scan setting
  • Step R4: Proton Elastic Kinematics
Run number Target Sieve Raster Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
Single-foil carbon No Off
15cm dummy No 2 x 2 mm2
15cm LH2 No 2 x 2 mm2


Target Boiling Study

  • H3 and He3 Target. Use C12 target as a normalization check for beam-current dependent rate check.
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
H3 25uA 2x2 cm
H3 15uA 2x2 cm
H3 5uA 2x2 cm

Beam Energy Measurements

Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
Carbon-Foil 25uA 2x2 cm
Carbon-Foil 15uA 2x2 cm