Difference between revisions of "Run Meeting: April 20th, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
Line 12: Line 12:
 
Smooth data taking during the last 24h. There were only minor beam issues i.e a
 
Smooth data taking during the last 24h. There were only minor beam issues i.e a
 
change in the 2nd pass separator phase.
 
change in the 2nd pass separator phase.
Hopefully, it will go on like this and we collecting nice data over the weekend.
 
  
Beam down this morning because of injector problem (Gun HV Air Pressure Fault - bad solenoid): Total down time ~1h30.
+
Collected statistics: 2.3 C < charge < 2.4 C on each target at run 100255.
 +
 
 +
Down times:
 +
injector problem (Gun HV Air Pressure Fault - bad solenoid): ~1h30 total;
 +
2pass separator phase drift (~30 minutes)
  
 
==Slides==
 
==Slides==

Revision as of 13:32, 20 April 2018

Back to:

Main Page
Daily Run Meetings

4:00PM Run Meeting, Counting house meeting room (200C)

RC: Eric Fuchey

(shifts)

e'p

Smooth data taking during the last 24h. There were only minor beam issues i.e a change in the 2nd pass separator phase.

Collected statistics: 2.3 C < charge < 2.4 C on each target at run 100255.

Down times: injector problem (Gun HV Air Pressure Fault - bad solenoid): ~1h30 total; 2pass separator phase drift (~30 minutes)

Slides


BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653