Difference between revisions of "Run Meeting: April 20th, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
 
(5 intermediate revisions by the same user not shown)
Line 12: Line 12:
 
Smooth data taking during the last 24h. There were only minor beam issues i.e a
 
Smooth data taking during the last 24h. There were only minor beam issues i.e a
 
change in the 2nd pass separator phase.
 
change in the 2nd pass separator phase.
Hopefully, it will go on like this and we collecting nice data over the weekend.
+
 
 +
Collected statistics: 2.3 C < charge < 2.4 C on each target at run 100255.
 +
 
 +
Down times:
 +
: injector problem (Gun HV Air Pressure Fault - bad solenoid): ~1h30 total;
 +
: 2pass separator phase drift (~30 minutes)
 +
: adaq1 freezing issue + subsequent DAQ trouble: ~30 minutes down.
  
 
==Slides==
 
==Slides==

Latest revision as of 15:59, 20 April 2018

Back to:

Main Page
Daily Run Meetings

4:00PM Run Meeting, Counting house meeting room (200C)

RC: Eric Fuchey

(shifts)

e'p

Smooth data taking during the last 24h. There were only minor beam issues i.e a change in the 2nd pass separator phase.

Collected statistics: 2.3 C < charge < 2.4 C on each target at run 100255.

Down times:

injector problem (Gun HV Air Pressure Fault - bad solenoid): ~1h30 total;
2pass separator phase drift (~30 minutes)
adaq1 freezing issue + subsequent DAQ trouble: ~30 minutes down.

Slides


BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653