Difference between revisions of "Run Meeting: April 9th, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
Line 12: Line 12:
 
*kin15/kin16 in progress.
 
*kin15/kin16 in progress.
 
*Beam study during day shift.
 
*Beam study during day shift.
 +
*Tuesday 8am to noon for cavity recovery and 2nd pass separator restoration.
 
*Controlled access: Hall A walkthrough, detector checklist
 
*Controlled access: Hall A walkthrough, detector checklist
  

Revision as of 09:05, 9 April 2018

Back to:

Main Page
Daily Run Meetings

4:00PM Run Meeting, Counting house meeting room (200C)

RC: Shujie Li

(shifts)

Status

  • kin15/kin16 in progress.
  • Beam study during day shift.
  • Tuesday 8am to noon for cavity recovery and 2nd pass separator restoration.
  • Controlled access: Hall A walkthrough, detector checklist

Slides


BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653