Difference between revisions of "Run Meeting: April 9th, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 12: Line 12:
 
*kin15/kin16 in progress.
 
*kin15/kin16 in progress.
 
*Beam study during day shift.
 
*Beam study during day shift.
*Tuesday 8am to noon for cavity recovery and 2nd pass separator restoration.
+
*Tuesday 9am to noon for cavity recovery and 2nd pass separator restoration.
*Controlled access: Hall A walkthrough, detector checklist
+
*Controlled access from 9am to 3pm:
 +
Hall A walkthrough (Doug), coincidence trigger test (Florian), and LHRS magnet work (Jack)
  
 
==Slides==
 
==Slides==

Latest revision as of 15:42, 9 April 2018

Back to:

Main Page
Daily Run Meetings

4:00PM Run Meeting, Counting house meeting room (200C)

RC: Shujie Li

(shifts)

Status

  • kin15/kin16 in progress.
  • Beam study during day shift.
  • Tuesday 9am to noon for cavity recovery and 2nd pass separator restoration.
  • Controlled access from 9am to 3pm:

Hall A walkthrough (Doug), coincidence trigger test (Florian), and LHRS magnet work (Jack)

Slides


BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653