Difference between revisions of "Run Meeting: February 19th, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
 
(2 intermediate revisions by the same user not shown)
Line 7: Line 7:
 
We run in these conditions (variable beam stability) most of the weekend...  
 
We run in these conditions (variable beam stability) most of the weekend...  
  
... until Sunday night excitment: VESDA started to go off around 11pm; request beam off (in case);
+
... until Sunday night excitment: VESDA started to give alarms around 11pm; request beam off (in case);
 
( + right Q1 PS had gone off, after communication went down;)
 
( + right Q1 PS had gone off, after communication went down;)
-> first short access for a visual check; => smell from labyrinth, haze in the hall;
+
-> first short access for a visual check; => smell from labyrinth, haze in the hall;
-> need to go to controlled access for full investigation;
+
-> went to controlled access for full investigation: Summary at https://logbooks.jlab.org/entry/3534243 ;
=> Outcome:
+
 
  
 
Beam taken back on Monday morning for following tasks:
 
Beam taken back on Monday morning for following tasks:
- rematch the injector and the North Linac (in energy, presumably);
+
Work at injector to fix low energy tails
- investigate RF instabilities;
+
RF recovery;
- perform RF recovery (there are many cavities down, and those remaining are at the edge...);*
 
 
 
=> controlled access: fix what has to be fixed (Q1 PS, etc.)
 
  
 +
In the meantime, controlled access: investigate cause of yesterday's incident.
 +
Right Q1 power supply out of order, and repairs not trivial: either repair the existing unit, or swap it with another one (https://logbooks.jlab.org/entry/3534446)
 +
=> We will have to go to controlled access during the day for repairs, and run during swing and owl with Left arm only for the few next days.
  
Plan: Wait for beam back, and resume production on Kin 15 and 16.
+
Plan: Wait for beam back, and resume production on Kin 15...
  
  

Latest revision as of 16:20, 19 February 2018

Back to Main Page Daily_Run_Meetings

4:00PM Run Meeting, Counting house meeting room (200C)

Summary of weekend: Beam came back at the turn of swing shift on Friday. Beam had requested current, but lacked stability. We run in these conditions (variable beam stability) most of the weekend...

... until Sunday night excitment: VESDA started to give alarms around 11pm; request beam off (in case); ( + right Q1 PS had gone off, after communication went down;) -> first short access for a visual check; => smell from labyrinth, haze in the hall; -> went to controlled access for full investigation: Summary at https://logbooks.jlab.org/entry/3534243 ;


Beam taken back on Monday morning for following tasks: Work at injector to fix low energy tails RF recovery;

In the meantime, controlled access: investigate cause of yesterday's incident. Right Q1 power supply out of order, and repairs not trivial: either repair the existing unit, or swap it with another one (https://logbooks.jlab.org/entry/3534446) => We will have to go to controlled access during the day for repairs, and run during swing and owl with Left arm only for the few next days.

Plan: Wait for beam back, and resume production on Kin 15...


Slides

BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653

To join via Browser: https://bluejeans.com/372278653/browser