Run Meeting: February 20th, 2018

From Tritium Experiments Group
Revision as of 10:42, 20 February 2018 by Efuchey (talk | contribs)
Jump to navigation Jump to search

Back to Main Page Daily_Run_Meetings

4:00PM Run Meeting, Counting house meeting room (200C)

Summary of past 24h:

The beam came back yesterday around 6:00 pm, and we got back to production around 8pm. Unser was down, unnoticed, most of the time. Hopefully data are recoverable, but will require extra analysis work.

Hall has been brought to controlled access to swap the right Q1 power supply. Hopefully that should be dome *today*. Unser will also be looked at.

Plan: Go back to production for Kin 15 and Kin 16 once the right Q1 is back.


Slides

BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653