Difference between revisions of "Run Meeting: February 22nd, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
(Created page with "Back to Main Page Daily_Run_Meetings 4:00PM Run Meeting, Counting house meeting room (200C) Summary of past 24h: Plan: ===Slides=== BlueJeans connec...")
 
 
(One intermediate revision by one other user not shown)
Line 4: Line 4:
  
 
Summary of past 24h:
 
Summary of past 24h:
 +
We have been in steady production mode since the magnet recovery. He3 data taking has been finished this morning for the column-13, and we switched to Tritium target around 9:10 am. The accelerator was down for 3hrs due to NL vacuum problem since 11 am this morning, but it's coming back as of now (2:30 pm).
  
  
Plan:  
+
Plan: Continue production data taking once CW beam is back.
 
 
  
 
===Slides===
 
===Slides===
  
 +
Tyler K [https://hallaweb.jlab.org/dvcslog/H3/180221_141522/calibration_methods.pdf Comparison of RHRS calibration methods]
  
 
BlueJeans connection info:
 
BlueJeans connection info:

Latest revision as of 15:39, 22 February 2018

Back to Main Page Daily_Run_Meetings

4:00PM Run Meeting, Counting house meeting room (200C)

Summary of past 24h: We have been in steady production mode since the magnet recovery. He3 data taking has been finished this morning for the column-13, and we switched to Tritium target around 9:10 am. The accelerator was down for 3hrs due to NL vacuum problem since 11 am this morning, but it's coming back as of now (2:30 pm).


Plan: Continue production data taking once CW beam is back.

Slides

Tyler K Comparison of RHRS calibration methods

BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653