'''Day shift'''
 
'''Day shift'''
 
: Beam off for several hours.
 
: Beam off for several hours.
: Controlled Access (CANCELLED)
+
: Controlled Access <span style=color:red>(CANCELLED)</span>
 
::Douglas walk-through
 
::Douglas walk-through
 
::Vacuum system small inspection  
 
::Vacuum system small inspection  
 
: Tuning beam ~14:00
 
: Tuning beam ~14:00
::Carbon hole
 
::Carbon Target
 
  
:data production
 
  
  
 
<span style=color:red>'''DATA Status'''</span>
 
<span style=color:red>'''DATA Status'''</span>
  
 +
Round VIII. Column 24/24. 1st H3 Run.
  
 
==Plan:==
 
==Plan:==
Line 65: Line 63:
 
===Slides===
 
===Slides===
  
 +
*[https://hallaweb.jlab.org/wiki/images/9/96/Pass1Overview.pdf Pass 1 Overview] (Evan)
 +
*[https://wiki.jlab.org/tegwiki/images/e/e9/Beam_quailty.pdf Beam quality cut] (Bane)
  
 
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/
 
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/

Latest revision as of 16:11, 2 March 2018

Back to:

Main Page
Daily Run Meetings

4:00PM Run Meeting, Counting house meeting room (200C)


RC: Carlos Ayerbe

Summary of past 24h:

Accelerator

7:30 - ARC magnet issues causes the beam to be off. Same problem was reported last Wednesday. ---> https://cebaf.jlab.org/dtm/open-events?event_id=3456

Swing shift

data production
~17:50 beam down ~2h linac bypass ---> https://logbooks.jlab.org/entry/3541009
~19:00 CODA corresponding to LHRS crashed and unable to recover by crew. Ole Hansen called. Solution: reboot computer. ---> https://logbooks.jlab.org/entry/3541044
Ole Hansen Entry ---> https://logbooks.jlab.org/entry/3541027
Bob Michaels Entry ---> https://logbooks.jlab.org/entry/3541453

Owl shift

data production
several alarms on the gas shed due to high wind (just annoying) ---> https://logbooks.jlab.org/entry/3541235
07:30 beam off (see accelerator note).

Day shift

Beam off for several hours.
Controlled Access (CANCELLED)
Douglas walk-through
Vacuum system small inspection
Tuning beam ~14:00


DATA Status

Round VIII. Column 24/24. 1st H3 Run.

Plan:

Continue taking data and extend the columns

EXTRA:

Monday Beam Studies
Start 9:00 am
  • opportunistic beam.
    • FFB (2h)
  • Beam OFF
    • 'eta' tool devel (2h)
    • Optics (3h)
Beam back 16:00-17:00.
Tuesday RF Recovery
Start 8:30
Ends 12:30

Slides

Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/

BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653