(Created page with "Back to Main Page Daily_Run_Meetings 4:00PM Run Meeting, Counting house meeting room (200C) Summary of past 24h: Plan: ===Slides=== BlueJeans connecti...")
 
Line 1: Line 1:
Back to [[Main_Page|Main Page]] [[Daily_Run_Meetings]]
+
'''Back to:'''
 +
: [[Main_Page|Main Page]]
 +
: [[Daily_Run_Meetings|Daily Run Meetings]]
  
 
4:00PM Run Meeting, Counting house meeting room (200C)
 
4:00PM Run Meeting, Counting house meeting room (200C)
  
Summary of past 24h:
 
  
 +
'''RC:''' Carlos Ayerbe
  
Plan:  
+
==Summary of past 72h:==
 +
 
 +
'''Accelerator'''
 +
: 7:30 - ARC magnet issues causes the beam to be off. Same problem was reported last Wednesday. ---> https://cebaf.jlab.org/dtm/open-events?event_id=3456
 +
 
 +
<span style=color:blue>'''Friday March 2nd'''</span>
 +
 
 +
'''Swing shift'''
 +
: data production
 +
 
 +
'''Owl shift'''
 +
: data production
 +
: Due to a misunderstanding in the crew, two runs with H2 were taken.
 +
 
 +
'''Day shift'''
 +
: data production
 +
: 09:27 Beam to the Hall off due to Beamstopper A-chain dropped ---> https://logbooks.jlab.org/entry/3541990
 +
 
 +
<span style=color:blue>'''Saturday March 3rd'''</span>
 +
 
 +
'''Swing shift'''
 +
: data production
 +
 
 +
'''Owl shift'''
 +
: data production
 +
 
 +
'''Day shift'''
 +
: data production
 +
 
 +
 
 +
<span style=color:blue>'''Sunday March 4th'''</span>
 +
 
 +
'''Swing shift'''
 +
: data production
 +
 
 +
'''Owl shift'''
 +
: data production
 +
 
 +
'''Day shift'''
 +
: data production
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
<span style=color:red>'''DATA Status'''</span>
 +
 
 +
Round IX. Column 25/(24+4).
 +
 
 +
==Plan:==
 +
 
 +
-Changing LHRS polarity
 +
-measuring positrons (LHRS)
 +
-Normal running RHRS
 +
 
 +
Total: two shifts.
 +
 
 +
 
 +
<span style=color:red>'''EXTRA:'''</span>
 +
;Monday Beam Studies
 +
 
 +
:Start 9:00 am
 +
 
 +
*opportunistic beam.
 +
**FFB (2h)
 +
 
 +
*Beam OFF
 +
** 'eta' tool devel (2h)
 +
**Optics (3h)
 +
 
 +
:Beam back 16:00-17:00.
 +
 
 +
;Tuesday RF Recovery
 +
 
 +
:Start 8:30
 +
:Ends 12:30
  
 
===Slides===
 
===Slides===
 +
 +
*[https://hallaweb.jlab.org/wiki/images/9/96/Pass1Overview.pdf Pass 1 Overview] (Evan)
 +
*[https://wiki.jlab.org/tegwiki/images/e/e9/Beam_quailty.pdf Beam quality cut] (Bane)
 +
 +
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/
  
 
BlueJeans connection info:
 
BlueJeans connection info:

Revision as of 11:22, 3 March 2018

Back to:

Main Page
Daily Run Meetings

4:00PM Run Meeting, Counting house meeting room (200C)


RC: Carlos Ayerbe

Summary of past 72h:

Accelerator

7:30 - ARC magnet issues causes the beam to be off. Same problem was reported last Wednesday. ---> https://cebaf.jlab.org/dtm/open-events?event_id=3456

Friday March 2nd

Swing shift

data production

Owl shift

data production
Due to a misunderstanding in the crew, two runs with H2 were taken.

Day shift

data production
09:27 Beam to the Hall off due to Beamstopper A-chain dropped ---> https://logbooks.jlab.org/entry/3541990

Saturday March 3rd

Swing shift

data production

Owl shift

data production

Day shift

data production


Sunday March 4th

Swing shift

data production

Owl shift

data production

Day shift

data production




DATA Status

Round IX. Column 25/(24+4).

Plan:

-Changing LHRS polarity -measuring positrons (LHRS) -Normal running RHRS

Total: two shifts.


EXTRA:

Monday Beam Studies
Start 9:00 am
  • opportunistic beam.
    • FFB (2h)
  • Beam OFF
    • 'eta' tool devel (2h)
    • Optics (3h)
Beam back 16:00-17:00.
Tuesday RF Recovery
Start 8:30
Ends 12:30

Slides

Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/

BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653