Difference between revisions of "Run Meeting: March 5th, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
Line 17: Line 17:
 
'''Swing shift'''
 
'''Swing shift'''
 
: data production
 
: data production
 +
 +
<span style=color:blue>'''Saturday March 3rd'''</span>
  
 
'''Owl shift'''  
 
'''Owl shift'''  
Line 26: Line 28:
 
: 09:27 Beam to the Hall off due to Beamstopper A-chain dropped ---> https://logbooks.jlab.org/entry/3541990
 
: 09:27 Beam to the Hall off due to Beamstopper A-chain dropped ---> https://logbooks.jlab.org/entry/3541990
 
: 12:10 beam Back
 
: 12:10 beam Back
 
<span style=color:blue>'''Saturday March 3rd'''</span>
 
  
 
'''Swing shift'''
 
'''Swing shift'''
 
: data production
 
: data production
 +
 +
<span style=color:blue>'''Sunday March 4th'''</span>
  
 
'''Owl shift'''  
 
'''Owl shift'''  
Line 37: Line 39:
 
'''Day shift'''
 
'''Day shift'''
 
: data production
 
: data production
 
 
<span style=color:blue>'''Sunday March 4th'''</span>
 
  
 
'''Swing shift'''
 
'''Swing shift'''
 
: data production
 
: data production
 +
 +
<span style=color:blue>'''Mondayy March 5th'''</span>
  
 
'''Owl shift'''  
 
'''Owl shift'''  
Line 57: Line 58:
 
<span style=color:red>'''DATA Status'''</span>
 
<span style=color:red>'''DATA Status'''</span>
  
Round IX. Column 25/(24+4).  
+
Round IX. Column 25/(24+4).
  
 
==Plan:==
 
==Plan:==

Revision as of 16:44, 3 March 2018

Back to:

Main Page
Daily Run Meetings

4:00PM Run Meeting, Counting house meeting room (200C)


RC: Carlos Ayerbe

Summary of past 72h:

Accelerator

7:30 - ARC magnet issues causes the beam to be off. Same problem was reported last Wednesday. ---> https://cebaf.jlab.org/dtm/open-events?event_id=3456

Friday March 2nd

Swing shift

data production

Saturday March 3rd

Owl shift

data production
Due to a misunderstanding in the crew, two runs with H2 were taken instead of He3.

Day shift

data production
09:27 Beam to the Hall off due to Beamstopper A-chain dropped ---> https://logbooks.jlab.org/entry/3541990
12:10 beam Back

Swing shift

data production

Sunday March 4th

Owl shift

data production

Day shift

data production

Swing shift

data production

Mondayy March 5th

Owl shift

data production

Day shift

data production




DATA Status

Round IX. Column 25/(24+4).

Plan:

-Changing LHRS polarity -measuring positrons (LHRS) -Normal running RHRS

Total: two shifts.


EXTRA:

Monday Beam Studies
Start 9:00 am
  • opportunistic beam.
    • FFB (2h)
  • Beam OFF
    • 'eta' tool devel (2h)
    • Optics (3h)
Beam back 16:00-17:00.
Tuesday RF Recovery
Start 8:30
Ends 12:30

Slides

Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/

BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653