Difference between revisions of "Run Meeting: March 5th, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
Line 33: Line 33:
 
: 19:50 Raster X power off ---> https://logbooks.jlab.org/entry/3542196
 
: 19:50 Raster X power off ---> https://logbooks.jlab.org/entry/3542196
 
: 20:40 Bill Gunning enter under control access to repair. 24V power supply replaced ---> https://logbooks.jlab.org/entry/3542226
 
: 20:40 Bill Gunning enter under control access to repair. 24V power supply replaced ---> https://logbooks.jlab.org/entry/3542226
:: ~1,5h without production.
+
:: ~2 without production.
  
 
<span style=color:blue>'''Sunday March 4th'''</span>
 
<span style=color:blue>'''Sunday March 4th'''</span>

Revision as of 00:18, 4 March 2018

Back to:

Main Page
Daily Run Meetings

4:00PM Run Meeting, Counting house meeting room (200C)


RC: Carlos Ayerbe

Summary of past 72h:

Accelerator

7:30 - ARC magnet issues causes the beam to be off. Same problem was reported last Wednesday. ---> https://cebaf.jlab.org/dtm/open-events?event_id=3456

Friday March 2nd

Swing shift

data production

Saturday March 3rd

Owl shift

data production
00:50 beam off ~1h due HPA water problem
Due to a misunderstanding in the crew, two runs with H2 were taken instead of He3.

Day shift

data production
09:27 Beam to the Hall off ~1.5h due to Beamstopper A-chain dropped ---> https://logbooks.jlab.org/entry/3541990

Swing shift

data production
19:50 Raster X power off ---> https://logbooks.jlab.org/entry/3542196
20:40 Bill Gunning enter under control access to repair. 24V power supply replaced ---> https://logbooks.jlab.org/entry/3542226
~2 without production.

Sunday March 4th

Owl shift

data production

Day shift

data production

Swing shift

data production

Monday March 5th

Owl shift

9:00 Beam Studies
Parasitic data
11:00 Controlled Access
LHRS Polarity changed
Vacuum minor inspection
Walk-through

Day shift

LHRS positrons data
RHRS data production




DATA Status

Round IX. Column 25/(24+4).

Plan:

-Changing LHRS polarity -measuring positrons (LHRS) -Normal running RHRS

Total: two shifts.


EXTRA:

Monday Beam Studies
Start 9:00 am
  • opportunistic beam.
    • FFB (2h)
  • Beam OFF
    • 'eta' tool devel (2h)
    • Optics (3h)
Beam back 16:00-17:00.
Tuesday RF Recovery
Start 8:30
Ends 12:30

Slides

Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/

BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653