Line 55: Line 55:
  
 
'''Owl shift'''  
 
'''Owl shift'''  
: 9:00 Beam Studies
+
 
:: Parasitic data
+
Change of plans!!!
: 11:00 Controlled Access
+
 
 +
All the time schedule is moved one hour late in order to allow Hall C finish a kinematic point before change polarity with control access.
 +
 
 +
Hall A and B entered in controlled access early (9:00) so we didn't run parasitic runs.
 +
 
 +
: 9:00 Beam Studies <span style=color:red>(+1h)</span>
 +
:: Parasitic data <span style=color:red>(No Hall A)</span>
 +
: 11:00 Controlled Access <span style=color:red>((RadCon requested at 9:00)</span>
 
:: LHRS Polarity changed
 
:: LHRS Polarity changed
 
:: Vacuum minor inspection
 
:: Vacuum minor inspection

Revision as of 10:10, 5 March 2018

Back to:

Main Page
Daily Run Meetings

4:00PM Run Meeting, Counting house meeting room (200C)


RC: Carlos Ayerbe

Summary of past 72h:

Accelerator

7:30 - ARC magnet issues causes the beam to be off. Same problem was reported last Wednesday. ---> https://cebaf.jlab.org/dtm/open-events?event_id=3456

Friday March 2nd

Swing shift

data production

Saturday March 3rd

Owl shift

data production
00:50 beam off ~1.5h due HPA water problem
Due to a misunderstanding in the crew, two runs with H2 were taken instead of He3.

Day shift

data production
09:27 Beam to the Hall off ~1.5h due to Beamstopper A-chain dropped ---> https://logbooks.jlab.org/entry/3541990

Swing shift

data production
19:50 Raster X power off ---> https://logbooks.jlab.org/entry/3542196
20:40 Bill Gunning enter under control access to repair. 24V power supply replaced ---> https://logbooks.jlab.org/entry/3542226
~2h without production.

Sunday March 4th

This day we dedicated to take H3 and He3 data in exclusive until obtain ~30k good electrons at each target.

Owl shift

data production

Day shift

data production

Swing shift

data production
Beam quality degrading along the shift.
21:40 1L24 SEL Quenches and 2L09 dropped HV. Beam off for 3h.
---> https://logbooks.jlab.org/entry/3542772
---> https://logbooks.jlab.org/entry/3542778

Monday March 5th

Owl shift

Change of plans!!!

All the time schedule is moved one hour late in order to allow Hall C finish a kinematic point before change polarity with control access.

Hall A and B entered in controlled access early (9:00) so we didn't run parasitic runs.

9:00 Beam Studies (+1h)
Parasitic data (No Hall A)
11:00 Controlled Access ((RadCon requested at 9:00)
LHRS Polarity changed
Vacuum minor inspection
Walk-through

Day shift

LHRS positrons data
RHRS data production




DATA Status

Round IX. Column 25/(24+4).

Plan:

-Changing LHRS polarity
-measuring positrons (LHRS)
-Normal running RHRS

Total: two shifts.


EXTRA:

Tuesday RF Recovery
Start 8:30
Ends 12:30