Run Meeting: March 5th, 2018

From Tritium Experiments Group
Revision as of 16:40, 3 March 2018 by Gayoso (talk | contribs)
Jump to navigation Jump to search

Back to:

Main Page
Daily Run Meetings

4:00PM Run Meeting, Counting house meeting room (200C)


RC: Carlos Ayerbe

Summary of past 72h:

Accelerator

7:30 - ARC magnet issues causes the beam to be off. Same problem was reported last Wednesday. ---> https://cebaf.jlab.org/dtm/open-events?event_id=3456

Friday March 2nd

Swing shift

data production

Owl shift

data production
Due to a misunderstanding in the crew, two runs with H2 were taken instead of He3.

Day shift

data production
09:27 Beam to the Hall off due to Beamstopper A-chain dropped ---> https://logbooks.jlab.org/entry/3541990
12:10 beam Back

Saturday March 3rd

Swing shift

data production

Owl shift

data production

Day shift

data production


Sunday March 4th

Swing shift

data production

Owl shift

data production

Day shift

data production




DATA Status

Round IX. Column 25/(24+4).

Plan:

-Changing LHRS polarity -measuring positrons (LHRS) -Normal running RHRS

Total: two shifts.


EXTRA:

Monday Beam Studies
Start 9:00 am
  • opportunistic beam.
    • FFB (2h)
  • Beam OFF
    • 'eta' tool devel (2h)
    • Optics (3h)
Beam back 16:00-17:00.
Tuesday RF Recovery
Start 8:30
Ends 12:30

Slides

Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/

BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653