4:00PM Run Meeting, Counting house meeting room (200C)


RC: Carlos Ayerbe

Summary of past 72h:

Accelerator

7:30 - ARC magnet issues causes the beam to be off. Same problem was reported last Wednesday. ---> https://cebaf.jlab.org/dtm/open-events?event_id=3456

Friday March 2nd

Swing shift

data production

Saturday March 3rd

Owl shift

data production
Due to a misunderstanding in the crew, two runs with H2 were taken instead of He3.

Day shift

data production
09:27 Beam to the Hall off due to Beamstopper A-chain dropped ---> https://logbooks.jlab.org/entry/3541990
12:10 beam Back

Swing shift

data production

Sunday March 4th

Owl shift

data production

Day shift

data production

Swing shift

data production

Monday March 5th

Owl shift

9:00 Beam Studies
Parasitic data
11:00 Controlled Access
LHRS Polarity changed
Vacuum minor inspection
Walk-through

Day shift

LHRS positrons data
RHRS data production




DATA Status

Round IX. Column 25/(24+4).

Plan:

-Changing LHRS polarity -measuring positrons (LHRS) -Normal running RHRS

Total: two shifts.


EXTRA:

Monday Beam Studies
Start 9:00 am
  • opportunistic beam.
    • FFB (2h)
  • Beam OFF
    • 'eta' tool devel (2h)
    • Optics (3h)
Beam back 16:00-17:00.
Tuesday RF Recovery
Start 8:30
Ends 12:30