Difference between revisions of "Run Meeting: May 2nd, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
(set up daily run page)
Line 11: Line 11:
 
==(e,e'p)==
 
==(e,e'p)==
  
Data taking finished at 7AM.
+
* Problem with the L HRS motor controller
 +
* Moved to x=1 kinematics for the last owl shift
 +
* Data taking finished at 7AM.
  
 
==xB>1==
 
==xB>1==
  
 
Tasks for today:
 
Tasks for today:
* Accelerator: switch to first pass beam
+
* Accelerator
* Experiment:
+
** RF Recovery
 +
** Switch to first pass beam
 +
* Experiment
 
** Change trigger
 
** Change trigger
** Move to new angle settings
+
** Reconfigure CODA
 +
** Move to new angle/momentum settings
 
** Reverse polarity
 
** Reverse polarity
 
* Run
 
* Run

Revision as of 14:36, 2 May 2018

Back to:

Main Page
Daily Run Meetings

4:00PM Run Meeting, Counting house meeting room (200C)

RC: Axel Schmidt

(shifts)

(e,e'p)

  • Problem with the L HRS motor controller
  • Moved to x=1 kinematics for the last owl shift
  • Data taking finished at 7AM.

xB>1

Tasks for today:

  • Accelerator
    • RF Recovery
    • Switch to first pass beam
  • Experiment
    • Change trigger
    • Reconfigure CODA
    • Move to new angle/momentum settings
    • Reverse polarity
  • Run
    • Move from phase-1 to phase-3

Slides